Laserfiche WebLink
Wisconsin Department of Safety and Professional Services Phone:608-2662112 <br /> Division of Industry Services :/`' Web:htto:!/dsps.wi.gov <br /> 4822 Madison Yards Way s i Email:dsps(a-4isconsin,gov <br /> PO Box 7302 ! <br /> Madison,WI 537074 Tony Evers,Governor <br /> �`Fswt,Hra <br /> Dan Hereth,Secretary <br /> Conditionally <br /> August 28,2023 APPROVED <br /> DEPT.OF SAFETY AND PROFESSIONAL <br /> SERVICES <br /> CONDITIONAL APPROVAL DIVISION OF INDUSTRY SERVICES <br /> PLAN APPROVAL EXPIRES:2025-8-28 <br /> Plan Review: PWTS-082301857-C SEE CORRESPONDENCE <br /> Rick Brown <br /> PO Box 637 <br /> Spooner,WI <br /> SITE: <br /> Brown <br /> 24775 County Road H <br /> Town of Dewey <br /> Burnett County <br /> S4-T38N-R14W <br /> FOR: <br /> Description: No floor drain-150 GPD—75"to At-Grade Component Manual—Ver. 3.0(May <br /> limiting factor-Maintenance required 2022-2027 <br /> Pressure Distribution Component Manual—Ver. <br /> 2.1(May2022-2027) <br /> "Manuals Have Been UPDATED!!" <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin <br /> Administrative Codes and Wisconsin Statutes.The submittal has been CONDITIONALLY APPROVED.This <br /> system is to be constructed and located in accordance with the enclosed approved plans and with any <br /> component manual(s)referenced above.The owner,as defined in chapter 101.01(10),Wisconsin <br /> Statutes, is responsible for compliance with all code requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the <br /> Department per s.145.06,stats. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> Reminders <br /> • The site shall be properly prepared prior to plowing.Any grasses longer than 6"shall be cut short <br /> and removed.To avoid matting,any leaves or loose organic matter shall be raked up and <br /> removed.Cut trees and shrubs flush to the ground and leave stumps.Avoid operating equipment <br /> on the At-Grade site. If necessary,use only tracked equipment,during dry conditions,with <br /> minimal passes,to avoid compaction. <br /> • Components and soil removed from an existing drainfield shall be properly disposed of so that <br /> there is no risk to public or environmental health. <br /> • A sanitary permit must be obtained from the county where this project is located in accordance <br /> with the requirements of Sec. 145.19,Wis.Stats. <br /> • Inspection of the private sewage system installation is required.Arrangements for inspection shall <br />