My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/08/08 - SANITARY - SAN - New Non-Press - SAN-23-116
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
19446
>
2023/08/08 - SANITARY - SAN - New Non-Press - SAN-23-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 6:10:03 PM
Creation date
1/14/2025 3:00:10 PM
Metadata
Fields
Template:
Property Files v2
Document Date
8/8/2023
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
New Non-Press
County Permit Number
SAN-23-116
State Permit Number
654801
Tax ID
19446
19446
19446
Pin Number
07-028-2-40-14-07-5 15-706-088000
07-028-2-40-14-07-5 15-706-088000
07-028-2-40-14-07-5 15-706-088000
Legacy Pin
028937509400
028937509400
028937509400
Municipality
TOWN OF SCOTT
TOWN OF SCOTT
TOWN OF SCOTT
Owner Name
DEAN B HILGERS
DEAN B HILGERS
DEAN B HILGERS
Property Address
3060 ASPEN TER
3060 ASPEN TER
3060 ASPEN TER
City
DANBURY
DANBURY
DANBURY
State
WI
WI
WI
Zip
54830
54830
54830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In Ground Plan View <br /> 000000000000000000000000000000000 0111111 0000000 <br /> 000000000000000000000000000000000000000000000 <br /> 000000000000000000000000000000000000000 0000000 : <br /> 0000000000000000000000000000000000000000000000 OpOpOp0p0p0p0p00000p <br /> . 00000000000000000000000 0000000000 • <br /> • 0000000000000000000000000000000000000000000000 �®1 V7216.t1 000000000 0000000000 <br /> 0000000000000 0000000000 0000 00000 <br /> Calculations <br /> 1 2.75 ft A 3.25 ft 113asal Area Required 300 ft2 <br /> K 1 ft B 25 ft 113asal Area Proposed 325 ft2 <br /> S 1.00ft L 27ft <br /> W 13.00 ft <br /> Basal Area Calculation GeoMat Dispersal Cell Basal Area Calculation <br /> GPD Loading Rate GPD Loading Rate <br /> 300 1 gal/sq ft/day 300 2.00 gal/sq ft/day <br /> Totall 300 ft2 Total 150 ft2 <br /> Proposed 162.5 ft2 <br /> Number of Cells 2 GeoMat Width 3.25 ft <br /> Cell Length 25.00 ft Lineal Feet of GeoMat Required 46.2 <br /> Min.Cell Length 23.1 ft Lineal Feet of GeoMat Proposed 50 <br /> Cell Spacing 1.00 ft NOTE:Min S dimension= V <br /> System Elevation 97.77 ft <br /> Limiting Factor 95.57 ft <br /> Separation 2.21 ft 2'Min <br /> Directions: <br /> Play with cell length to get desired cell spacing, length and width. Remember system SHOULD be longer than it is <br /> wide. It must also Satisfy basal loading rate and GeoMat cell loading rate. <br /> Project: DEAN B. HILGERS Page 3 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.