Laserfiche WebLink
Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> oes the proposed CSM fit with the parcel map, if available? <br /> _L�;e all structures,bodies of water,wetlands,slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> A07Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> Y Reconciles with Real Property Listing-Comments <br /> NDoes this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> N Has there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> �Is the parcel in MFL? <br /> Does CSM change or cross school or other taxing districts? <br /> _q_Parcel Identification Number(s): 14 209 o- g 2 l O <br /> Lot Number with improvements- LpE i <br /> Treasurer Review-(Let Surveyor know about delinquency) <br /> >o Treasurer Check for Taxes owed TPX05 ift IN GA U,- AKA <br /> SIGNATURE OF REVIEWER: DATE: / 7i <br /> \production\SURVEY\MISC rrEMS\Review Docs\CSM checksheet May_2018 <br />