My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/04/06 - SANITARY - SAN - Other
Burnett-County
>
Property Files
>
TOWN OF TRADE LAKE
>
24377
>
2005/04/06 - SANITARY - SAN - Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:26:11 PM
Creation date
9/27/2017 10:03:29 PM
Metadata
Fields
Template:
Property Files v2
Document Date
4/6/2005
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
24377
Pin Number
07-034-2-37-18-21-5 15-436-019000
Legacy Pin
034902001900
Municipality
TOWN OF TRADE LAKE
Owner Name
WENDY HAGELIN
Property Address
20961 SUNSET LANDING DR
City
FREDERIC
State
WI
Zip
54837
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mound System Management Plan <br /> Pursuant to Comm 83.54,Wis.Adm.Code <br /> General <br /> This system shall be operated in accordance with Comm 82-84 Wis.Adm.Code,and shall maintained in accordance with its' <br /> component manuals(SBD-10691-P(N.01/01)and SSWMP Publication 9.6(01/81)]and local or state rules pertaining to system <br /> maintenance and maintenance reporting. <br /> No one should ever enter a septic or pump tank since dangerous gases may be present that could cause death. <br /> Septic and pump tank abandonment shall be in accordance with Comm 83.33,Wis.Adm.Code when the tanks are no longer used as <br /> POWTS components. <br /> Septic or pump tank manhole risers,access risers and covers should be inspected for water tightness and soundness. Access <br /> openings used for service and assessment shall be sealed watertight upon the completion of service. Any opening deemed unsound, <br /> defective,or subject to failure must be replaced. Exposed access openings greater than&inches in diameter shall be secured by an <br /> effective locking device to prevent accidental or unauthorized entry into a tank or component. <br /> Septic Tank <br /> The septic tank shall be maintained by an individual certified to service septic tanks under s.281.48,Stats. The contents of the septic <br /> tank shall be disposed of in accordance with NR 113,Wis.Adm.Code. The operating condition of the septic tank and outlet fitter shall be <br /> assessed at least once every 3 years by inspection. <br /> The outlet filter shall be cleaned as necessary to ensure proper operation. The filter cartridge should not be removed unless provisions <br /> are made to retain solids in the tank that may slough off the filter when removed from its enclosure. If the fitter is equipped with an alarm, <br /> the filter shall be serviced the alar is activated continuously. Intermittent finer alarms may indicate surge flows or an impending <br /> continuous alar. <br /> The septic tank shall have its contents removed when the volume of sludge and scum in the tank exceeds 1/3 the liquid volume of the <br /> tank. If the contents of the tank are not removed at the time of a triennial assessment,maintenance personnel shall advise the owner of <br /> when the next service needs to be performed to maintain less than maximum scum and sludge accumulation in the tank. <br /> The addition of biological or chemical additives to enhance septic tank performance is generally not required. However,if such <br /> products are used they shall be approved for septic tank use by the Department of Commerce. <br /> Pump Tank <br /> The pump(dosing)tank shall be inspected at least once every 3 years. All switches,alarms,and pumps shall be tested to verify proper <br /> operation. If an effluent filter is installed within the tank it shall be inspected and serviced as necessary. <br /> Mound and Pressure Distribution System <br /> No trees or shrubs should be planted on the mound. Plantings may be made around the mound's perimeter,and the mound shall be <br /> seeded and mulched as necessary to prevent erosion and to provide some protection from frost penetration. Traffic(other than for <br /> vegetative maintenance)on the mound is not recommended since soil compaction may hinder aeration of the infiltrative surface within the <br /> mound and snow compaction in the winter will promote frost penetration. Cold weather installations(October-February)dictate that the <br /> mound be heavily mulched as protection from freezing. <br /> Influent quality into the mound system may not exceed 220 mg/L BODS, 150 mg/L TSS,and 30 mg/L FOG for septic tank effluent or 30 <br /> mg/L BODS,30 mg/L TSS,10 mg/L FOG,and 10"cfu/100 mL for highly treated effluent. Influent flow may not exceed maximum design <br /> flow specified in the permit for this installation. <br /> The pressure distribution system is provided with a flushing point at the end of each lateral,and it is recommended that each lateral be <br /> flushed of accumulated solids at least once every 18 months. When a pressure test is performed 4 should be compared to the initial test <br /> when the system was installed to determine if orifice clogging has occurred and if orifice cleaning is required to maintain equal distribution <br /> within the dispersal cell. <br /> Observation pipes within the dispersal cell shall be checked for effluent ponding. Ponding levels shall be reported to the owner,and any <br /> levels above 6 inches considered as an impending hydraulic failure requiring additional,more frequent monitoring. <br /> Continency Plan <br /> If the septic tank or any of its components become defective the tank or component shall be repaired or replaced to keep the system in <br /> proper operating condition. <br /> If the dosing tank,pump,pump controls,alar or related wiring becomes defective the defective component(s)shall be immediately <br /> repaired or replaced with a component of the same or equal performance. <br /> If the mound component fails to accept wastewater or begins to discharge wastewater to the ground surface,it will be repaired or <br /> replaced in its'present location by increasing basal area if toe leakage occurs or by removing biologically cogged absorption and dispersal <br /> media,and related piping,and replacing said components as deemed necessary to bring the system into proper operating condition. <br /> See Page 5 of this plan for the name and telephone number of your local POWTS regulator and service provider. <br /> Project: Todd and Laura Knutson Mound Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.