Laserfiche WebLink
Local Health Authority; <br /> BumeComponent Manufacturer(tank): <br /> ' ¢Co.Zoning (7151,349-2138 <br /> Douglas Co.Zoning (715)395.1380 Skaw Precast (800)924-8625 <br /> POk Co.Znning (715)4859279 Weiser Conoete (800)3363416 <br /> Washburn Co.Zoning (715)968-2666 <br /> Ucel9sed Pumpers/I-rylter INalnbrwrlce: <br /> A-1 Septic Service (715)6567007 <br /> Chapman's Septic Service (715)656-7113 <br /> Installer: Hopkins Sand&Gravel (715)866-4157 Staves Septic SWAM (715)866.4195 <br /> Private Onsite Wastewater Treatment System Management Plan <br /> Distribution <br /> nt <br /> This management plan complies with Comm83.54,Wis. dm. Code,and tri appropriate SoiilAbsorption Component Manual for Private <br /> Onsite Wastewater Systems. The specific component manual for this P.O.W.T.S. is <br /> Table 1:System Design Specifications <br /> Sanitary Permit Number. Septic Tank Capacity(gal): 6100 <br /> Number of Bedrooms: .l Dose Tank Capacity <br /> Design Flow-Peak(gpd): 0 P (gal): <br /> Soil Absorption Comm ponent Size(Sq. Ft.):d 6 4 <br /> Estimated Flow-Average(gpd): )LOO Type of Wastewater: Domestic <br /> Table 2: Soil Absorption Component-Limits of Reliable Operation <br /> Septic Tank Soil Absorption <br /> om neat om onant <br /> Design Flow-Peak(gpd) <br /> Maximum Influent Particle Size(in) <br /> Maximum BOD(mg/L) n/a iB <br /> Maximum TSS(mg/L) n/a 220 <br /> Maximum FOG nM 150 <br /> n/A 30 <br /> Septic Tank Inspect and/or servicTable: Mary 3 y Maintenance <br /> Schedule <br /> Outlet Should inspect once a year and clean once every 3 years. <br /> Soil Absorption Component Inspect once every 3 years. <br /> Contingency Plan:Use alternate site it available or remove distribution pipe,aggregate or chambers&clogging mat.. Replace distribution pipe, <br /> aggregate or chambers&C-33 fine aggregate. <br /> septi <br /> Septic <br /> The accordance <br /> lank Shah 1 maintained by an individual sanded to service septic tanks under Tank <br /> s.281.48. Slats. The contents of the septic tank shat be disposed of n <br /> accordance with , O 113. wee. Adm.Code(Serviomg Septic or Holding Tanks. Pumping Chambers. Grease Interceptors. seepage Beds. Seepage Pits. Seepage <br /> Trenches, privies, a portable Reslroorrns). <br /> The operating condition of the septic tank and outlet Inter shall be assessed at bast once every 3 years by inspection. The outlet filer shall be cleaned as necessary <br /> to ensure proper operation. The liner cartridge should not be removed unless provisions are made to retain solids In the tank trial may slough off the idle when <br /> removed from its enclosure. m the filter is equipped with an alarm. the filler shall be serviced/the alarm is activated continuously. intermittent Idler alarms may <br /> indicate surge(lows or en impending continuous alarm.The septic tank shall have its contents removed when the volume of scum and sludge in the tank exceeds 1/3 <br /> the liquid volume of the Tank. If the contents of the lank are not removed at the time of assessment. maintenance personnel shall advise the owner of when the next <br /> service needs to be performed to maintain less than maxmum scum and sludge accumulation in the tank. <br /> No one should enter a septic or other treatment or holding tank for any reason without being in full compliance with OSHA standards for entering <br /> a confined space.The atmosphere within the septic or other treatment or holding tank may contain lethal glass,and rescue of am from the <br /> Interior of the tank may be difficult or impossible. <br /> Tank abondnment sham be in accordance with Comm 83.33. Wis-Adm. Code when the tank is no longer used as a P.O.W.T.S.component. <br /> Notice that the dose chamber may fill due to flow continuingduring <br /> Dose Chamber <br /> repaired may cause the mound component to have probles. In IPsu neuatfrb u ction Of power outages.One large dose when the power comes be Pumped by a on iton or when the pump is <br /> 0 other measures sham be used to dose the mound component with only me proper amount ump chamber Should <br /> his may include m11C SO anual o PunWe belwe Pump cycling begins <br /> such Time the pump chamber has reached its normal level. Dose chambers are to De aspected routinely and maintained when Operation d the pump controls until <br /> approvals. necessary in accordance with then <br /> il <br /> nt <br /> The soil n in Ta ion component saving this structure s designed toSxceptbdortie�k wastewater from a residential lacmlly. The vends of operation of iris component <br /> are shown in Table 2. <br /> The <br /> ity of a soil <br /> ho <br /> ends <br /> on <br /> oconspcomponent dnnaproper ekoemlaboperation. <br /> Go <br /> Practicesbyall occupants and the installation aterr conserving plurtbing fixturesarkey factors in extending the useful We of thisThe soe absorption componenrs operation must be assessed by inspection at last once every three years. The inspection shall include recording the levels of <br /> Ponding. <br /> o erosion should be inden Rled�and reported totheow ernforrrepair. The The evidence <br /> dof ischace rge of domestic wastage Of ewater or sew from tri from the component. system <br /> i sloping sees. <br /> considered a human health hazard. sewage system s prohibited and <br /> Traffic around or over the soil absorption component should be avoided Particularty during winter months. The conVaction or removal of snow cover over the <br /> .component sot may <br /> oyver this raulic failure <br /> componentwilli reduce dl. This fyltusionfailure <br /> 01 ox a usually temporary. but is al icull a impossible to repair until weather conditions improve. In <br /> Clogging of the sod. Ygen into the soil and dispersal cam, which may lead to more intense. and earlier. organic <br /> Plantings of deep-rooted trees and shrubs directly over or within ten feet 01 the component should be avoided since rool intrusion into the component may obstruct <br /> wastewater how <br /> Penial Distribution Network <br /> activalepfdo9mluSh the <br /> any solid bma erial,networThe alquid that es flube detected shed Out off the Werr Is sing ilo be directed bacends of k into he stheudistribution cell or No an acceptableplcontainer. if <br /> necessary the laterals can be cleaned. <br />