Laserfiche WebLink
QEp ARTME^,T <br /> Wisconsin Department of Safety and Professional Services y�' �� Phone:608-266-2112 <br /> Division of Industry Services `off Web:h=://dsps.wi.eov <br /> 4822 Madison Yards Way { Email:dsns(7o wisconsin.zov <br /> PO Box 7302 <br /> Madison,WI 53707 9ya Tony Evers,Governor <br /> �p� sus Dan Hereth,Secretary <br /> rJSIONAL' <br /> June 12,2024 <br /> CUST ID NO.:273420 Identification Numbers <br /> JAMES S DANIELS Plan Review No.:PWTS-062401275-C <br /> 27760 HWY 35 Application No.:DIS-062425698 <br /> WEBSTER,WI 54893 Site ID No.: SIT-131596 <br /> Please refer to all identification numbers in each <br /> correspondence with the Department. <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES:06/12/2026 <br /> MUNICIPALITY: Conditionally <br /> TOWN OF OAKLAND APPROVED <br /> BURNETT COUNTY DEPT.OF SAFETY AND PROFESSIONAL <br /> SERVICES <br /> DIVISION OF INDUSTRY SERVICES <br /> SITE: <br /> BONITA JEDLUND <br /> 6391 BUSHEY RD <br /> WEBSTER,WI 54893 <br /> SEE CORRESPONDENCE <br /> FOR: <br /> Design Wastewater Flow Value: 300 Mound Component Manual-Version 2.1 (May 2022-2027) <br /> Bedrooms:2 Pressure Distribution Component Manual-Version 2.1 <br /> Limiting Factor(s): 36" (May 2022-2027) <br /> Maintenance Required:Effluent Filter <br /> SITE REQUIREMENTS <br /> • A full size copy of the approved plans,specifications,and this letter shall be on-site during construction and open to inspection <br /> by authorized representatives of the Department,which may include local inspectors. A Department electronic stamp and <br /> signature shall be on the plans which are used at the job site for construction. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> • Preserve dispersal area prior and during construction to avoid disturbance,compaction and use of the site. <br /> • With new construction;it is recommended not to activate the pump in the dose tank until the tanks are pumped prior to <br /> homeowner occupancy. <br /> • Wastewater generated from contractors cleaning of equipment and tools and/or left over construction products shall not be <br /> discharged into the drains discharging to the private onsite wastewater treatment system(POWTS). Waste generated shall <br /> be properly disposed of on-site or off site. <br /> • Any tall grasses,leaves and shrubs shall be cut short and removed prior to tilling the surface for installation to prevent <br /> matting under the dispersal area. All loose organic material to be removed from POWTS Dispersal Area. <br /> • Divert surface water from all POWTS Areas. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches.Smearing and <br /> compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil moisture content can be <br /> determined by rolling a soil sample between the hands.If it rolls into a 1/4-inch wire,the site is too wet to prepare.If it <br /> crumbles,site preparation can proceed.If the site is too wet to prepare,do not proceed until it dries. <br /> • All piping shall conform to SPS Table 384.30-3 and SPS Table 384.30-5 <br /> • Insulate building sewer beyond 30 feet per SPS 382.30(11)(c) <br />