Laserfiche WebLink
• `��,P ARTMEN <br /> Wisconsin Department of Safety and Professional Services 5�Y Ton Phone:608-266-2112 <br /> Division of Industry Services C y Web:hap://dsps.wi.gov <br /> 4822 Madison Yards Way Email:dsps�a wisconsin.gov <br /> PO Box 7302 <br /> Madison,WI 53707 7 � Tony Evers,Governor <br /> Dan Hereth,Secretary <br /> ^-�SfONPL <br /> January 12,2024 <br /> CUST ID NO.: 851954 Identification Numbers <br /> ROSS JEREMY TOLLANDER Plan Review No.:PWTS-012400058-C <br /> 6881 AUSTIN LAKE RD Application No.:DIS-012401074 <br /> WEBSTER,WI 54893 Site ID No.: SIT-125708 <br /> Please refer to all identification numbers in each <br /> correspondence with the Department. <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES:01/12/2026 Conditionally <br /> APPROVED <br /> DEPT.OF SAFETY AND PROFESSIONAL <br /> SERVICES <br /> MUNICIPALITY: <br /> DIVISION OF INDUSTRY SERVICES <br /> TOWN OF WOOD RIVER <br /> BURNETT COUNTY <br /> SITE: SEE CORRESPONDENCE <br /> KEITH JOHNSON MOUND PLAN <br /> 11367 COUNTY RD D <br /> GRANTSBURG,WI 54840 <br /> SEC. T38N R18W <br /> FOR: <br /> Design Wastewater Flow Value:450 Mound Component Manual-Version 2.1 (May 2022-2027) <br /> Bedrooms:3 <br /> Limiting Factor(s): 19 Inches <br /> Maintenance Required:Effluent Filter <br /> SITE REQUIREMENTS <br /> • A full size copy of the approved plans,specifications,and this letter shall be on-site during construction and open to inspection <br /> by authorized representatives of the Department,which may include local inspectors. A Department electronic stamp and <br /> signature shall be on the plans which are used at the job site for construction. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> • Preserve dispersal area prior and during construction to avoid disturbance,compaction and use of the site. <br /> • With new construction;it is recommended not to activate the pump in the dose tank until the tanks are pumped prior to <br /> homeowner occupancy. <br /> • Wastewater generated from contractors cleaning of equipment and tools and/or left over construction products shall not be <br /> discharged into the drains discharging to the private onsite wastewater treatment system(POWTS). Waste generated shall be <br /> properly disposed of on-site or off site. <br /> • Any tall grasses,leaves and shrubs shall be cut short and removed prior to tilling the surface for installation to prevent matting <br /> under the dispersal area. All loose organic material to be removed from POWTS Dispersal Area. <br /> • Divert surface water from all POWTS Areas. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches.Smearing and <br /> compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil moisture content can be determined <br /> by rolling a soil sample between the hands.If it rolls into a 1/4-inch wire,the site is too wet to prepare.If it crumbles,site <br /> preparation can proceed.If the site is too wet to prepare,do not proceed until it dries. <br /> • All piping shall conform to SPS Table 384.30-3 and SPS Table 384.30-5 <br />