Laserfiche WebLink
9FpARTAAfp <br /> Wisconsin Department of Safety and Professional Services Phone:608-266-2112 <br /> Division of Industry Services `or 9� Web:bn://dsRss.wi.gov <br /> 4822 Madison Yards Way 3 < Email:dMs17a.wisconsin.gov <br /> PO Box 7302 <br /> Madison,WI 53707 9� Tony Evers,Governor <br /> Dan Hereth,Secretary <br /> �JSIONPL <br /> April 5,2024 <br /> CUST ID NO.:224832 Identification Numbers <br /> MARY JO HUPPERT Plan Review No.:PWTS-042400592-C <br /> 25720 FIREFLY LANE Application No.:DIS-032413172 <br /> WEBSTER,WI 54893 Site ID No.: SIT-128457 <br /> Please refer to all identification numbers in each <br /> correspondence with the Department. <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES: 04/05/2026 <br /> CONDITIONALLY <br /> MUNICIPALITY: APPROVED <br /> F SAFETY AND PROFESSIONAL <br /> TOWN OF JACKSON DEPT.ODIVISION OF INDUSTRY SERVICES SERVICES <br /> BURNETT COUNTY <br /> i <br /> SITE: eidehzmvn,041OW 024 <br /> VOYAGER VILLAGE POA SEE CORRESPONDENCE <br /> SETTING SUN DRIVE <br /> DANBURY,WI 54830 <br /> LOT 80, S09,T40N,R 15 W <br /> FOR: <br /> Design Wastewater Flow Value: 450 Geomat Mound Component Manual-5/18/22 <br /> Bedrooms: 3 Pressure Distribution Component Manual-Version 2.1 <br /> Limiting Factor(s):25 Inches (May 2022-2027) <br /> Maintenance Required: Effluent Filter <br /> SITE REQUIREMENTS <br /> • A full size copy of the approved plans,specifications,and this letter shall be on-site during construction and open to inspection <br /> by authorized representatives of the Department,which may include local inspectors. A Department electronic stamp and <br /> signature shall be on the plans which are used at the job site for construction. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> • Preserve dispersal area prior and during construction to avoid disturbance,compaction and use of the site. <br /> • With new construction; it is recommended not to activate the pump in the dose tank until the tanks are pumped prior to <br /> homeowner occupancy. <br /> • Wastewater generated from contractors cleaning of equipment and tools and/or left over construction products shall not be <br /> discharged into the drains discharging to the private onsite wastewater treatment system(POWTS). Waste generated shall be <br /> properly disposed of on-site or off site. <br /> • Any tall grasses,leaves and shrubs shall be cut short and removed prior to tilling the surface for installation to prevent matting <br /> under the dispersal area. All loose organic material to be removed from POWTS Dispersal Area. <br /> • Divert surface water from all POWTS Areas. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches. Smearing and <br /> compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil moisture content can be determined <br /> by rolling a soil sample between the hands.If it rolls into a 1/4-inch wire,the site is too wet to prepare.If it crumbles,site <br /> preparation can proceed.If the site is too wet to prepare,do not proceed until it dries. <br /> • All piping shall conform to SPS Table 384.30-3 and SPS Table 384.30-5 <br /> • Insulate building sewer beyond 30 feet per SPS 382.30(11)(c) <br />