My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/26 - OTHER - (NA) - Note
Burnett-County
>
Property Files
>
MULTI PARCEL DOCS
>
Note
>
2025/06/26 - OTHER - (NA) - Note
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 5:00:12 PM
Creation date
6/26/2025 4:07:27 PM
Metadata
Fields
Template:
Property Files v2
Document Date
6/26/2025
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
Note
Tax ID
24155
24156
Pin Number
07-034-2-37-18-29-4 03-000-011000
07-034-2-37-18-29-4 04-000-012000
Legacy Pin
034152904000
034152904200
Municipality
TOWN OF TRADE LAKE
TOWN OF TRADE LAKE
Owner Name
DAVE & MARY FALK
DAVE & MARY FALK
Property Address
12413 COUNTY RD Z
City
GRANTSBURG
State
WI
Zip
54840
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'T e 0 <br /> Z <br /> State of Wiseons6I \ DEPARTMENT OF NATURAL RESOURCES <br /> L. P. Vorg► <br /> Secretary <br /> Box 450 <br /> August 16, 1972 MADISON, WISCONSIN 53701 <br /> n M IN REPLY REFER T0: <br /> 3560-4 <br /> G-7783 <br /> Mr. John E. Beaudr y �.r <br /> Box 206 C" <br /> Frederic, Wisconsin 54837 o_ U(?'� j <br /> 61 <br /> ry <br /> Dear Mr. Beaudry: <br /> Re: Approval of Plans of Farm <br /> Pond Dam, Burnett County <br /> The Department of Natural Resources has examined the plans for your farm <br /> pond dam to be constructed in conformance with the specifications of the <br /> Soil Conservation Service of the U. S. Department of Agriculture on a non- <br /> navigable stream in the southern half of the southeast quarter of section <br /> 29, township 37 north, range 18 west, in Burnett County. The plans <br /> (drawing No. W1-1-371, dated June 1972) , have been found to be acceptable <br /> for a structure holding a head of 6 feet and a permanent pool less than <br /> 2.36 acres, and are hereby, approved in accordance with Chapter 31, Statutes, <br /> provided the upstream portion of the dam is constructed of silt and/or clay <br /> soils. <br /> Section 31.12(4) , Statutes, requires that a verified statement be filed <br /> with the Department within ten days after completion of the dam, stating <br /> that it was constructed in accordance with the plans and specifications <br /> approved by the Department. <br /> STATE OF WISCONSIN DEPARTMENT OF NATURAL RESOURCES <br /> For the Secretary <br /> By <br /> Thomas A. Calabresa, P.E. , Acting Director <br /> Bureau of Water and Shoreland Management <br /> RWR:kb <br /> Cc: L. A. Posekany <br /> ----">L. G. Hansen - Spooner <br /> Kenneth Eggleston ASCS <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.