Laserfiche WebLink
MOBILE-CELLULAR-COMMUNICATION TOWER <br /> LAND USE PERMIT APPLICATION N <br /> Burnett County, WI <br /> a <br /> m <br /> Permit Fees: <br /> New Tower $3000 <br /> Class 1 Collocation $3000 G <br /> Class 2 Collocation $500 <br /> C� <br /> *NOTE:After-the-fact(when no permit is obtained prior to construction)is up to three times the normal fee. °< <br /> *New Tower and Class I Collocation—this,fee includes permits for related structures on the ground. <br /> *Class?Collocation—this fee does NOT include permits for structures on the ground. A separate land use <br /> permit it he needed for structures on the ground. <br /> Burnett County regulates the placement of and/or modification to towers in accordance with Chapter 30,Burnett County <br /> Code of Ordinances,Chapter 66.0404 Wisconsin Stats.,and 2013 Wisconsin Act 20(which was enacted by Wisconsin on <br /> 7/l/2013). This permit application,once received by the Land Services Department,shall serve as the official notification to begin <br /> o <br /> application review,and permit issuance time constraints referenced in the above mentioned regulations. Once the application T <br /> is reviewed,the applicant will be notified if more information is needed,or an issued permit will be mailed to the applicant. o <br /> Class 1 Collocation means the placement of a new mobile service facility on an existing support structure,such as the <br /> owner of the facility does not need to construct a free standing support structure for the facility,but does need to engage <br /> in substantial modification. j <br /> Class 2 Collocation means the placement of a new mobile service facility on an existing support structure,such that the e e d <br /> owner of the facility does not need to construct a free standing support structure for the facility or engage in substantial o <br /> modification. <br /> v <br /> Substantial modification means the modification of a service support structure including the mounting of an antenna "' <br /> on the structure that does any of the following: y <br /> - For structures with an overall height of 200 ft or less,increases the overall height of the structure by more than N b0 <br /> 20 ft <br /> - For structures with an overall height of more than 200 ft,increases the overall height of the structure by 10 <br /> percent or more g <br /> - Measured at the level of the appurtenance added to the structure as a result of the modification,increases the 3 <br /> width of the support structure by 20 ft or more,unless a larger area is needed for collocation v, <br /> - Increases the square-footage of an existing equipment compound to a total area of more than 2,500 square feet <br /> N <br /> Applicant Complete All Sections Below This Line ^ , -I 1 <br /> Parcel Owner Name: American Tower (cell tower owner) \v <br /> r <br /> Parcel Owner Mailing Address: 10 Presidential Way <br /> r, z <br /> Woburn, MA 01801 <br /> City State Zip <br /> Applicant's Name: David Connell <br /> co <br /> Applicant's Business Name: SMJ International o/b/o American Tower and AT&T Fee Rij: <br /> Ln Ck#: <br /> Applicant's Mailing Address: 49030 Pontiac Trail, Suite 100 Wixom, MI 48393 0 <br /> City State Zip y <br /> z <br /> Applicant's Telephone Number: 630-464-5893 <br /> < w <br /> Applicant's Email: dconnell@smj-llc.com _ o <br /> y v>w <br /> **If staff has a question about this application,you will be contacted via email. Make sure your email address Z w <br /> is legible and your email provider will accept emails from the following address:@BurnettCountyWLgov o m ` C <br /> z t70 N M� <br /> CD M <br /> -0 t�i i <br /> Page 1 of 5 i<j <br /> Burnett County, WI Tower Application—Rev 11/2024 cD <br /> a <br />