Laserfiche WebLink
Job Details <br /> AVWII will: <br /> -Install helical piers as indicated <br /> on the drawing <br /> -Install 4' of box steel on piers <br /> for house foundation <br /> -Attempt to lift house foundation <br /> -Install 6 new deck piers <br /> -Install helical tiebacks on all piers <br /> on the North side of the house <br /> -Excavate behind retaining wall <br /> -Install 6 helical anchors on retaining <br /> wall and attempt to straighten <br /> Level/void fill basement slab with Poly]ev <br /> `-� <br /> HP HP HP <br /> HP'. �HPj iHP P HP HP <br /> J Ul HP <br /> F a <br /> HP' <br /> �( HP: <br /> If the floor doesnt level <br /> itself during lifting of <br /> the foundation, AWW will <br /> — emove and replace concrete <br /> as needed to smooth out <br /> floor for an additional charge <br /> �® MEJ� <br /> O- <br /> Typeof Wall ..................................................................................................... ....... ............. Poured Concrete <br /> ExistingWall Finish ....................................................................................................................................... Plain <br /> Existing Floor Finish ....................................................................................................................... Concrete/Carpet <br /> AMERICAN WATERWORKS Job Location Page 2/10 <br /> 1307 Val leyhigh Dr NW Rochester MN 55901 1268 Roberts Rd Spooner WI 54801 8-19-25(5) <br />