Laserfiche WebLink
Job Details (Continued) <br /> 10.)Customer understands due to the nature of the project,there maybe further cleaning needed by the customer once the project is <br /> completed.For instance,while the Production Team will do their best to mitigate the concrete dust,it may still be present once the work <br /> is complete and require additional cleaning to be done by the customer. <br /> 11.)If the customer will list is not complete before the project start date,the customer's discount may be void and additional charges may <br /> apply. <br /> 12.)By signing,customer has reviewed the drawing,understands the drawing notes and understands the expectations of the"Customer <br /> Will"section. <br /> Customer Signature: Date: <br /> 13.)Customer will provide electrical installation for either the sump pump system(recommend dedicated outlet for each AC pump @ 20 <br /> amp each)and/or the AprilAire Radon Mitigation system as necessary(external with a direct line and switch;or internal with an outlet <br /> and light source above <br /> Product List <br /> Lift and Level <br /> PolyLEVEL ................................................................................................................. 1 areas <br /> Permanently Stabilize Foundation <br /> HelicalPier Zone 2 .......................................................................................................................................... 11 <br /> AdminFees ..................................................................................................................................................... 1 <br /> 3"Helical Pier,Low Profile Bracket ...................................................................................................................... 11 <br /> Helical Anchor,12"x28"Wall Plate ...................................................................................................................... 12 <br /> InteriorPier Finished Wall Add On ........................................................................................................................ 4 <br /> 1stAnnua I Maintenance ..................................................................................................................................... 1 <br /> BoxSteel .................................................................................................................................................... 44 ft <br /> Scaffolding ...................................................................................................................................................... <br /> 1 <br /> Grade-Level Excavation .................................................................................................................................... 26 <br /> WallExcavation(Half Wall) .............................................................................................................................. 13 ft <br /> Limited Access Excavation ADD-ON(Half Wall) ..................................................................•••• 13 ft <br /> Lateral Support Bracket(Foundation) ..................................................................................................................... 6 <br /> HelicalDeck Pier Bracket 6x6 .............................................................................................................................. 6 <br /> NewConstruction Helical Deck Pier ....................................................................................................................... 6 <br /> LateralSupport Bracket(Decks) ............................................................................................................................ 6 <br /> Permanently Stabilize Walls <br /> HelicalAnchor,12"x28"Wall Plate ........................................................................................................................ 6 <br /> Prepwall for straightening .................................................................................................................................. 1 <br /> Straighten Walls Immediately <br /> WallExcavation(Half Wall) .............................................................................................................................. 28 ft <br /> Limited Access Excavation ADD-ON(Half Wall) •••••.......••••••........•• 28 ft <br /> Additionallabor ................................................................................................................................................ 1 <br /> Lift and Level - Areas <br /> Area Title LxWxD Lbs Location Notes <br /> Void fill basement slab 17x26x1 136 Front <br /> Filling(Indoor) <br /> AMERICAN WATERWORKS Job Location Page 4/10 <br /> 1307 Valleyhigh Dr NW Rochester MN 55901 1268 Roberts Rd Spooner WI 54801 8-19-25(5) <br />