Laserfiche WebLink
Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> s the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands,slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> At Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> 1 Reconciles with Real Property Listing—Comments <br /> tiDoes this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> dIs it monumented the same as a plat with bigger monuments at corners? <br /> Has there been an adjacent CSM recorded with 4 parcels of 1 Y2 acres each or less within a period of 5 years? <br /> / 236.02(12) <br /> N Is the parcel in MFL? <br /> --F.- <br /> Does CSM change or cross school or other taxing districts? r/ <br /> Parcel Identification Number(s): 11)5 3705& 4— 3 7 v 5/ <br /> Lot Number with improvements— 1.11 T 02- <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> 'C' Treasurer Check for Taxes owed TES pa 4,c, -- <br /> gcn, <br /> SIGNATURE OF REVIEWER: DATE: /� z�ZO <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May 2018 <br />