Laserfiche WebLink
j,1n� �1a,:•4,- •' ., i. ate,. , . ,= !,S de.. _a <br /> 1. - Cell tecolVIDatt <br /> K ' <br /> • <br /> .•:.„20°0°0°0°0°0°0° 0 0°00000°0°0°0°0°0°0°0°0°0°0°0°0°0 d7o° • <br /> ° 0° °0°0° o0 0 0000...•.••;• <br /> :': .:.::i00008:04000000°000°00000°000000000m000e000gooro 0 0 o,.P,o•-sw-•0."-9 00 00 o °o`L0°o ...•.• <br /> 70000 0,p 0 0�00 000 02 4-1,00�000000000 0000 8eomat 00,0o°0_y°o o a`: <br /> •5°00�0 00 00°0000 0 0°0 0°0°0°0 0 0°0°2� <br /> Calculations <br /> I 1.5 ft A 3.25 ft Basal Area Required 600 ft2 <br /> K 1 ft B 100 ft Basal Area Proposed 625 ft2 <br /> S 0.00 ft L 102 ft <br /> . W 6.25 ft <br /> Basal Area Calculation GeoMat Dispersal Cell Basal Area Calculation <br /> GPD Loading Rate GPD Loading Rate <br /> 600 1 gal/sq today 600 2.00 gausq ft/day <br /> Total' 600 ft2 Total 300 ft2 <br /> Proposed 325 ft2 <br /> Number of Cells 1 I GeoMat Width 3.25 ft <br /> Cell Length. 100.00 ft Lineal Feet of GeoMat Required 92.3 <br /> Min. Cell Length 92.3 ft Lineal Feet of GeoMat Proposed 100 <br /> Cell Spacing 0.00 ft NOTE-Min S dimension= i' <br /> System Elevation r R9.4$_ffr-> REVISED <br /> Limiting Factor 87.4 ft <br /> Separation 2.08 ft 2'Min <br /> Directions: <br /> Play with cell length to get desired cell spacing,length and width. Remember system SHOULD be longer than it is <br /> wide. It must also Satisfy basal loading rate and GeoMat cell loading rate. <br /> Project: MICHAEL J. &SARA L.AXIOTIS Page 3 of 13 <br />