Laserfiche WebLink
checks shall be removed once the final <br /> grading and channel stabilization is applied. <br /> C. Sediment deposits shall be removed when <br /> deposits reach 0.5 the height of the barrier. <br /> Removal of sediment may require <br /> rep laecment of stone Maintenance shall be <br /> completed as soon as possible with <br /> considemtion to site conditions. <br /> IX. References <br /> W isDOT"Erosion Control Product Acceptability <br /> List'is available online at: <br /> hat'//www dot wiscons n uov/business/enerserv/ <br /> pal ht m Printed copies are no longer distributed. <br /> X. Definitions <br /> Ora(V.C.1): 'h he particle size for which 50%of <br /> the material by weight is smaller than that size. <br /> Ditch Checks(1)Are commonly referred to as <br /> temporary check dams. Stone ditch checks refer <br /> to those made out of either stone or rock. <br /> WDNR 3 <br /> 03/06 <br />