Laserfiche WebLink
Cross-section of an In-ground Component Cell <br /> Slope % = I f . <br /> Finished Grade = %-p Observation Pipe <br /> Natural Grade = 'J Finished Grade = 970 <br /> Natural Grade <br /> Lateral Elev. = 6 7 <br /> Geotextile Fabric <br /> System Elev.= <br /> ,., <br /> � i- aent:aaicl'lsp�rsal Zoite' <br /> Nonpressurized perforated drain piping shall conform to one of the standards listed in Table 84.30-4 <br /> Geotextile Fabric to meet Comm 84.30(6)(g), Wis Adm.Code Requirements <br /> Stone Aggregate to meet Comm 84.30(6)(i), Wis Adm. Code Requirements <br /> Minimum of 12" of aggregate to include 2" over the top of distribution pipe. <br /> Minimum of 12" of cover over top distribution cell <br /> Two observation/vent pipes to be provided per cell <br /> Not To Scale <br /> KHS 17/14/00 <br />