My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/03/09 - OTHER - (NA) - Note
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
18194
>
2016/03/09 - OTHER - (NA) - Note
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 8:27:58 AM
Creation date
10/2/2017 4:38:39 PM
Metadata
Fields
Template:
Property Files v2
Document Date
3/9/2016
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
Note
Tax ID
18194
Pin Number
07-028-2-40-14-19-5 05-004-020000
Legacy Pin
028411902100
Municipality
TOWN OF SCOTT
Owner Name
AMY J IHLEN KARIN R TELLEKSON
Property Address
28313 FONTAINE RD
City
WEBSTER
State
WI
Zip
54893
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State of Wisconsin LAKESHORE EROSION CONTROL- RIPRAPIVEGETATED ARMORING <br /> Department of Natural Resources General Permit Application Checklist <br /> dnr.wi.qov (06/2013) <br /> Eligibility Criteria: <br /> Projects that do not meet all criteria are not eligible for this general permit. If your project does not <br /> qualify for this general permit, you may a ply for an individual permit. <br /> Riprap or vegetated armoring may not exceed 200 linear feet of shoreline. <br /> The project site is a moderate or high energy site; or a low energy site where the bank-edge recession <br /> described in s. NR 328.08 (3) is equal to or greater than 0.5 feet per year and the applicant can show a <br /> biological erosion control structure was previously placed according to the standards in s. NR 328.04 (3) <br /> and (4). <br /> Note: NR 328.08 (3) requires that the time between separate measurements shall equal or exceed 3 <br /> months during the open-water season. <br /> Note: The applicant will satisfy the"equal to or greater than 0.5 feet per year" requirement by <br /> demonstrating that the bank-edge recession is equal to or greater than 1.5 inches per 3 months during <br /> the open-water season_ <br /> Riprap shall be clean fieldstone or quarry stone 6 to 24 inches in diameter. <br /> The toe of the riprap may not extend more than 8 feet waterward of the ordinary high water mark. <br /> The final riprap slope may not exceed (be steeper than) 2 feet horizontal to one foot vertical. <br /> Riprap may not be placed at an elevation higher than the ordinary high water mark plus the storm-wave <br /> height as calculated in s. NR 328.08 (1). For waters subject to subch. II, riprap may not be placed at an <br /> elevation higher than the ordinary high water mark plus 1.5 times the storm-wave height calculated in <br /> s.NR 328.08. <br /> Note: The listed waters in subch. 11 are typified by following conditions-impounded; 2500 acres and <br /> larger; extensive water level fluctuation; high shoreline recession rates; historic loss of shoreline <br /> vegetation. <br /> No fill material or soil may be placed in a wetland or below the ordinary high water mark of any navigable <br /> waterway. <br /> The riprap shall follow the natural contour of the shoreline. <br /> Filter cloth or clean-washed gravel shall be used as a filter layer under the riprap to extend the life of the <br /> structure, improve effectiveness and prevent soil erosion behind the riprap <br /> Riprap or other vegetated armoring along moderate energy sites shall be re-vegetated above the <br /> ordinary high water mark by using native shrub plantings, native live stakes or native jointed plantings. <br /> Note: Erosion control treatments may include a 10-foot shoreline segment where plant establishment is <br /> not required for the purpose of ingresslegress associated with the placement of a pier or access to the <br /> waterway, or associated with public park activities. <br /> The structure may be placed and maintained only by a riparian. <br /> The project will not result in removal of greater than 20% of the aerial coverage of natural bank <br /> vegetation, emergent vegetation or floating vegetation, not including the area covered by the footprint of <br /> the riprap, or any access corridors necessary for the placement of the riprap. <br /> Any grading, excavation and land disturbance shall be confined to the minimum area necessary for the <br /> construction and may not exceed 10,000 square feet. <br /> Erosion control measures shall meet or exceed the technical standards for erosion control approved by <br /> the department under subch. V of ch. NR 151. Any area where topsoil is exposed during construction <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.