Laserfiche WebLink
BURNETT COUNTY ZONING ADMINISTRATION <br /> BURNETT COUNTY GOVERNMENT CENTER <br /> 7410 COUNTY ROAD K,#102 PHONE(715)349-2138 <br /> SIREN,WISCONSIN 54872 <br /> Augur[3,2009 <br /> Robert Carlson <br /> 3572 115'e Street <br /> Frederic,WI 54837 <br /> Conditional Approval <br /> Sanitary Permit expires August 3,2011, <br /> unless renewed prior to expiration. <br /> SITE: 6461 Pike Bend Road Legacy PIN#: 018 3326 05600 <br /> Melissa Parker(HSBC Bank USA MANA 2007-AF 1) <br /> Lot 1,CSM Vol. 1,Pg.68,in the NW'/.SW 1/4, Section 26,T39N R16W,Town of Meenon <br /> FOR: POWTS,conventional in-ground with lift <br /> Maintenance required: 300 gallons/day <br /> POWTS component manuals: In-ground Soil Absorption 2.0&SSWMP Publication 9.6 Design of <br /> Pressure Distribution Networks for ST-SAS <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin <br /> Administrative Codes and Wisconsin Statutes. The submittal has been Conditionally ADDroved. This <br /> system is to be constructed and located in accordance with the enclosed approved plans and with the <br /> component manual referenced above. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, <br /> is responsible for compliance with all code requirements. No person may engage in or work at plumbing in <br /> the state unless licensed to do so by the Department of Commerce per s. 145.06 stats. <br /> Key items and Reminders <br /> • System Elevation is proposed to be 95_00 for both soil absorption cells. <br /> • Maintain well and waterline setbacks per COMM 83.43(8)(i) <br /> • Materials shall conform to the requirements of COMM 84. <br /> • Properly abandon existing private sewage system. <br /> A copy of the approved plans shall be on-site during construction and open to inspection by authorized <br /> representatives of the County and the Department. All permits required shall be obtained prior to <br /> construction/installation. <br /> In granting this approval,Burnett County reserves the right to require changes or additions should <br /> conditions arise making them necessary for code compliance. <br /> The above left addressee shall provide a copy of this approval and permit to the owner and any others who <br /> are responsible for the installation,operation or maintenance of the POWTS. <br /> 51ynnroy Zoning Administrator. <br />