My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/09/17 - SANITARY - SAN - Other
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
33920
>
2013/09/17 - SANITARY - SAN - Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 9:57:56 AM
Creation date
10/2/2017 5:50:38 PM
Metadata
Fields
Template:
Property Files v2
Document Date
9/17/2013
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
33920
18353
Pin Number
07-028-2-40-14-21-1 02-000-014100
07-028-2-40-14-21-1 02-000-014000
Legacy Pin
028412101700
Municipality
TOWN OF SCOTT
TOWN OF SCOTT
Owner Name
KARI BUDGE
US BANK FIRSTAR CORP RE MNGT
Property Address
2385 COUNTY RD A
2385 COUNTY RD A
City
SPOONER
SPOONER
State
WI
WI
Zip
54801
54801
Previous Owners
KARI BUDGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State of <br /> Wisconsin \ DEPARTMENT OF HEALTH AND SOCIAL SERVICES <br /> DIVISION OF HEALTH <br /> October 17, 1977 <br /> STREET ADDRESS MADISON.WISCONSIN s„w <br /> IN REPLY PLEASE REFER TO: <br /> 1FCTIO1 O PLuw RIND <br /> ANO FIRE PROTECTION SYSTEMS <br /> Hopkins Sand E Gravel , Inc. <br /> Webster, WI 54893 <br /> Plan Identification No. 77-04547 <br /> Gentlemen: <br /> Re: First Bank of Grantsburg (New Bldg.) <br /> Sewage Disposal <br /> NW 1/4 NE 1/4 S21 T40N. R14W <br /> Township of Scott, Wisconsin <br /> Burnett County <br /> Examinationsof plumbing-plans-and specifications for the above-mentioned.__ _. <br /> project has been completed. <br /> In accord with Chapter 145, Wisconsin Statutes, and Chapter H 62, Wisconsin <br /> Administrative Code, the plumbing plans and specifications are approved <br /> contingent upon compliance with the stipulations indicated on the plans and <br /> thefollowing code sections. Please review your code for the requirements <br /> of each code section noted. <br /> 1 . H 62.20 (4) (d) 5. Inlet and outlet piping and joints. <br /> 2. H 62.20 (5) (9) 3• Seepage beds - distribution line spacing and headers. <br /> 3. H 62.20 (5) (g) 8. Construction.detail of soil absorption system. <br /> 4. The architect, professional engineer, registered designer, owner or <br /> plumbing contractor shall keep at the construction site one set of plans <br /> bearing the Stamp of approval of the department. <br /> 5. In the event installation of the plumbing improvements or system has <br /> not commenced within two years from this date, this approval shall become <br /> void and new application shall be made for approval of these plans before <br /> work may commence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.