Laserfiche WebLink
Local Healon Authority: <br /> Bumea Co Zoning (715),7,9}2138 Component Manufactunsotank): <br /> .Douglas Co.Zoning (7157395-138C Skaw Precast (800)924-8625 <br /> Po&Co.Zoning (715)4885-9279 Weiser Concete (600)33&3416 <br /> Washburn Co Zoning (715)468-2666 <br /> Lk:erhsed P Service <br /> (715lliter Mainte65r,70rance: <br /> A-1 Septic Service hco (715)656-7113 <br /> 7567007 <br /> Chapman's Sepik;Service (715)656-71 1 3 <br /> Installer: Hopkins Sand&Gravel (715)866-4157 Steve sSePbc Service (715)666-4195 <br /> Private Onsite Wastewater Treatment System Management Plan <br /> Distibution <br /> nt <br /> This management plan complies with COMM 83r54, Wis. Adm.C de,and the appropriate SoiilAbsorption Component Manual for Private <br /> Onsite Wastewater Systems. The specific component manual for this P.O.W.T.S. is: <br /> Sanitary Permit Number. Table 1:Syabm Dmlpn Specifications <br /> Number of Bedrooms; .t Septic Tank Capacity(gal). gee <br /> Design Flow-PeakSao Dose Tank Capacity(gal): <br /> (gPd) Soil Absorption Component Size(Sq. Ft.): 4 Sot <br /> Estimated Flow-Average(gpd) ,100 <br /> Type of Wastewater: Domestic <br /> Table 2: Soil Absorption Component-Unnits of Reliable Operation <br /> Septic Tank Sod Absorption <br /> tint nent om onent <br /> Design Flaw-Peak(gpd) <br /> Maximum Influent Particle Size (in) <br /> Maximum BOD (mg/L) n/a 1r6 <br /> Maximum TSS (mglL) n/a 220 <br /> Maximum FOG hill 150 <br /> n/a 30 <br /> Septic Tank Inspect and/orse Tab e3: Mai,a e a year and clean once every 3 years. <br /> ce Schedule <br /> Outlet Should inspect onc <br /> ears <br /> Soil Absorption Component Inspect once every 3 years. <br /> Contingency Plan:Use alternate site it available or remove distribution pipe, aggregate or chambers&clogging mat.. Replace distribution pipe, <br /> aggregate or chambers&C-33 fine aggregate. <br /> Septic <br /> tic <br /> The accordance <br /> lank shall be maintained Im by d individual ce piked to servos Septic arks urger Tank <br /> 281 48, Stars. The coolants d the septic lank sial be lois <br /> accordance wmh NR 113. Wle Adm Cade(Servohn9 Sepik: or Honing Septi. Pumping Chambers. Grease Interceptors. Seepage eves. Sae <br /> Trenches. Privies, a Ponabla Resurooms). Posed or in <br /> page PAs. Seepage <br /> The operating condition Of the septic tank and outlet Inter shall be assessed al least bade every 3 years by inspection. The outlet rain shall be cleaned as necessary <br /> to ensure proper operation. The Idler cartridge should nut be removed unless provisions are made to retain sours In the Wk gnat may slough dl the filer when <br /> removed from its enclosure. it the tier is equipped wen an alarm. the filer shall be sernQOd it the alarms activated conilnueusly. Inhermienl Igems may <br /> r war <br /> indicate surge lbws or an impending continuous alarm. The septic tank shelf have is contents removed when the volume d scum ane sludge fa We tank exceeds I O <br /> the liquid volume of the lank. If the contents of me tank are not remeVed al the Ilene Of assessment. maintenance personnel shatl advise the owner of when the next <br /> service needs to be performed to maintain less than maxhman scum and the accumulation in the tank. <br /> No one should enter a septic or other trsatrnent or holding tank for any reason without being in full comPliance with OSHA standards for entering <br /> a cordined space.The atrnosphsm within the septic or other treatment mar holding tank may contain lethal gases,and resous of a Person from the <br /> "Of bills tank may <br /> Tank abondonmenl shall be in accordance with Comm 83.33.!Wis � <br /> Adm, Code when the tank s no difficult or impossible. <br /> rruused as a P.O.W.T.S. component <br /> Notice that Ins dose chamber may IN due to flow continuingduringDont Chamber <br /> repaired may cause the mound component to have probles. In ein pump <br /> malfunction <br /> the Pump a Power duages.One large dose when the power comes on or when the pump is <br /> Of other measures shag be used to dose the mound component with on theo,-pe,Pump Chamber should be Pumped by a licensed pumpar belore u <br /> such time the pump chamber has reached its normal level. Dose cnam�s e Cpe m i d inlfuenl. This may include manual o pump cycling begins <br /> nit <br /> approvals. spected routneN and mandwrU d when necessary <br /> d the pump controls unlit <br /> nary in accordance with chert <br /> The sod absorption component serving this Sirucwre s desgned to accept Absorption <br /> wasmponent a resoental tacitly. The genre d o <br /> are shown in Table 2, perahon of Ina component <br /> The longevity of a soil absorplon component depends greatly on proper and hineN tnananance.and system use within or below the lungs d reliable <br /> operation Good <br /> water conservalion practices by all occupants and the irimagation d water consemng plumbing fixtures are key factors in extending the useful lie of this component. <br /> The sot absorption component's operation must be assessed by Imspaction at least Orta every three years. The inspection shag Inc <br /> lWe recording the level of <br /> Ponding, d any. in the observallon Pipes. and a visual inspection for any evidence of surtaoe seepage or discharge from the component. re ordingsleepthe leve sees. <br /> consideredma ghumanShould <br /> healthl he ard. and reported to me Owner lot reParr. The sonata dbCharge d domestic wastewater or sewage from In system IS Prohibited and <br /> Track around or over the sod absorption component should be avoided particularly during winter months. The cdrpaction or removal of snow cover over the <br /> component may lead to hydraulic failure by freezing. This type of failure 6 usually temporary, but a ddinud or impossible to repar until weather conditions Improve. In <br /> general. sot a son.pacllon over In* component will !educe diffusion 01 oxygen into ire sod and <br /> clogging So the sdispersal cell. which may lead to more Intense, and earlier. organo <br /> Plamlings of deep-rooted trees and shrubs directly over or within ten feel of the component should be avoided since roof intrusion into the component may obstruct <br /> wastewater how <br /> Distribution <br /> Partial plugging d me distribution network may be detected by extremely long dosing here The ends d the dislribullon laterals should be exposed <br /> activated to(lush Out any solid material The liquid that s flushed out d the laterals s 10 be directed back into the distribution cell or into an acceptable(container It <br /> necessary, the literals can be cleaned. <br />