Laserfiche WebLink
Cross-section of an In-ground Component Cell <br /> Slope % _ <br /> Finished Grade Z Observation Pipe <br /> Natural Grade = q,5,Z Finished Grade = 9#/5 <br /> Natural Grade <br /> Lateral Elev. _ X3.3 <br /> = <br /> Geotextile Fabric <br /> System Elev.= 42.5- <br /> w ' <br /> Trea409 <br /> i <br /> Nonpressurized perforated drain piping shall conform to one of the standards listed in Table 84.30-4 <br /> Geotextile Fabric to meet Comm 84.30(6)(g), Wis Adm.Code Requirements <br /> i <br /> Stone Aggregate to meet Comm 84.30(6)(1), Wis Adm. Code Requirements <br /> Minimum of 12" of aggregate to include 2" over the top of distribution pipe. <br /> Minimum of 12" of cover over top distribution cell <br /> Two observation/vent pipes to be provided per cell <br /> i <br /> Not To Scale <br /> I <br /> Us 1i 1 0 <br />