Laserfiche WebLink
(,1) QH�tALSTANDARDA(a)The structluemay aotbektaled (� Rmw OR VEGETATED ARMORM. Riprap or vegetated <br /> in an area of special natural resource interest armoring on the bed or bank of a lake or flowage may be autho. <br /> P fized under this general permit if it meets all of Ole requirements <br /> (b) The structure may be placed and maintained only by s of&N13211.041(3)with the exception that it may be located in an <br /> riparian. - area of special natural resource interest,and with additional Huai. <br /> (c) the projeclwiO not result in removal of greater than 201/a talions u follows: <br /> Of the aerial coverage of natural bank vegetation,emergent Me- (a) Ripmp or vegetated armoring may not exceed 200 linear <br /> talion or floating vegetation,not including ale area coveredby The feet of shoreline. <br /> footprint of the riprap,or any access corridors necessary for die (b) The pmjed site is a moderate or high energy site;or a low <br /> placement of the riprap. energy site where the bank—edge recession described in s.NR <br /> (d) Any grediog,excavation and land diaurbance shall be run- 328.08(3)is equal to or greater than OS feet per year and the appli- <br /> fined to the minimum area necessary for the construction and may cant can show a biological erosion control structure was pro- <br /> not exceed 10,000 square fact viously placed according to the standards in s.NR 328.04(3)and <br /> (e) Frosion control measures shall meet or exceed the technical (4). <br /> 'standards for em¢ion control approved by the department under No'ie.NR329A(3)roaaer m.sme ams bowcan stpim o emnancan sW <br /> snhcb.V of ch.NR 151. Any alta whom topsoil is exposeddurmg cqcW m-x 3 motW aurins the opeo-wanx msoa. <br /> construction shall be immediately seeded and mulched or <br /> Now Tbe.pr onsumdcsin lg60ft ba*-cde mcquel mas>�amos froperyen <br /> mqubemat by dmrom.tPoa art tlr bent-adQc roxsion r equal m or pvra aim <br /> Rpmppdtostayilizedisturbed areas and prevent soils frombeing ISWcbmper 3srrmteduring*aep�semon. <br /> eroded and washed into the waterway. (c) Riprap shall be clean fieldstone or quarry stere 6 to 24 <br /> Nan Tbne atadeda on be Pound m the fdiewur{wcbsae hapJlddcwLaovl inches in diameter. <br /> mayeamednn,MpdamnrwauwUA.tdabon (d) 'he ba of the ripm)i may not extend more,than 8 fed wster- <br /> () Unless part of a permanent stormvrater management rya- ward of the ordinary high water mark <br /> rem,all temporary erosion and sediment control practices shag be .(e) The final riprap slope may not exceed(be steeper thea)2 <br /> removed upon fun site stabilization. Areca disturbed during. feet horizontal to one foot vertical. <br /> coustructioa or installation shall be restored (f) RWap may not be placed at an elevation higher than the <br /> (g) All equipment used for the project shall be designed and ordinary high water mark plus the storm-crave height as calca- <br /> proparlysizedtotn,nhni+.the amount of sediment that can ereape IstedinRNR328:08(1). For waters subject to subch.11,riprap . <br /> into the water. may 40 be plated at an elevation higher than the ordinary high <br /> (h) No astetward extension of the property is permitted otter - water marc plus iS times the storm-wave height calculated in L <br /> than what is rrasoably necessary to conduct the project ander NR 328.08. <br /> tact the existing baric No soil or similar fill material may be <br /> placed in a wetland or below the ordinary high water mark Of any Notre ale uad wen is mbar.n are typified <br /> eimdade4 ssaauaeodlurreumalvn water Pond oaowia odtbm— <br /> naviablwaterwsy. onolwhishAuntlim <br /> (11 Dredgingcordea30.20(lg (b)1.,Stats.,isnotallowed naonesnacomosaevevRmm. _ . <br /> for the placement or maintenance of say shore erosion control (R) No SR material or soil may be patted in a wedsod or below <br /> stmctare under this section the ordinary high water mark of any navigable waterway. <br /> (h) 'heripmp shall follow flet natural contour of the shoreline. <br /> () Filter cloth or clean-washed gravel shall be usedes a filter <br /> layer ander the nprap to extend the life of the structure,improve <br /> effectiveness and prevent soil erosion behind the ripmp. <br /> G) Riprap or other vegetated armoring along moderate mara <br /> sites shall be re-vegetated above the ordinary high water mark by <br /> using native dumb plantings,native live stakes or nativejointed <br /> plantings. <br /> Ndm$mien mud tmyinelude a 10-foot shmelim meat Mune <br /> plant embliminmmt is rice mqubed for the purpom.of inpm/epaa associated with <br /> the placemen urn pier wmoons w the wercwy,oremocimdwith public put wdv- - <br /> him. <br /> (6) REFL atEN7 OF AN EximNa SEAWALL wrrx mpiLAP oR <br /> VEGETATED ARMORING. Replacement of an existing seawall with <br /> nprap or vegetated armoring on the bed or bank of a lake or flo. <br /> wage may be authorized under this,general permit if it meets all <br /> of the requirements of s.NR 328.04(3)and sub.(5)(c)to(j),with <br /> the exception that it may be located in an area of special nattual <br /> resource interest,and may not exceed 500 linear feet <br />