My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/04/11 - OTHER - (NA) - Note
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
17716
>
2011/04/11 - OTHER - (NA) - Note
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 7:53:15 AM
Creation date
10/3/2017 11:18:50 PM
Metadata
Fields
Template:
Property Files v2
Document Date
4/11/2011
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
Note
Tax ID
17716
Pin Number
07-028-2-40-14-05-5 05-002-011000
Legacy Pin
028410503700
Municipality
TOWN OF SCOTT
Owner Name
IRENE WOJTASIK KAREN M NASO
Property Address
2602 PINE KNOLL RD
City
DANBURY
State
WI
Zip
54830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State'of Wisconsin Attachment-Spawning Reef <br /> Department of Natural Resources General Permit Application Packet(111-09) <br /> www.dnr.wi.gov page l of 4 <br /> This is your SPAWNING REEF GENERAL PERMIT <br /> The Spawning Reef General Permit(GP)Attachment isto be used in conjunction with the"Water ResourcesAnnlication <br /> for Project Permits(WRAPP)"(Form#3500-53)and will not be accepted if submitted separately. Use this form when <br /> placing a spawning reef on the bed of public(navigable)waterway. Be advised the Construction Erosion and Sediment <br /> Contra "attachment is needed in addition to this General Permit Attachment if the land disturbing activity is one acre <br /> or more and the project is required to have an erosion and sediment control plan. - - <br /> Please fill out the form below. After you clearly demonstrate the project is eligible for the GP,this permit application <br /> is`Approved'once it is signed and dated by an authorized Wisconsin Department of Natural Resources employee. <br /> Section 1: Project Description <br /> Landowner(Applicant)Name County Waterbod Na e <br /> Total Area of Construction Site(acres) Total Estimated Disturbed Area (acres) <br /> Section 2: Permit Eligibility <br /> To qualify for this GP,your project must meet certain eligibility standards. Please review and certify'Yes"the project <br /> has been designed and will be constructed in compliance with ALL of the following GP eligibility standards. If your <br /> project does not meet all of the eligibility standards,you will need to apply for an Individual Permit(IP). Beadvisedthe <br /> Department has the final discretion to determine GP eligibility and may require information in addition to the initial <br /> permit application submittal or require an Individual Permit(IP) if site-specific conditions require additional review. <br /> General Permit Eligibility Standard Yes <br /> I am the riparian owner,or authorized representative of the riparian,that will be placing and maintaining the <br /> spawning reef within the riparian zone of interest. <br /> The spawning reef will be placed solely for the purpose of improving fish habitat. <br /> I will report the placement of the spawning reef to the departments local fisheries biologist within 30 days <br /> of placement. EK <br /> The spawning reef will be placed parallel to the shoreline and not more than 100 feet from shore. <br /> The bottom substrate at the location of the spawning reef consists of 90%sand. <br /> The spawning reef will not be placed in water depth greater than 5 feet. LU <br /> The spawning reef will not exceed 100 feet in length and will not be wider than 30 feet. <br /> The spawning reef will not be placed where the bottom contour of the waterway exceeds a slope of 4-foot <br /> horizontal to one-foot vertical <br /> Any deposition of sand,gravel or stone will only occur immediately underneath and within 1 foot of the <br /> spawning reef. <br /> Dredging will not occur during the lacement of the spawning reef. <br /> To minimize adverse impacts on fish movement,fish spawning,egg incubation periods and high stream <br /> flows,the project will not occur during the following time periods: <br /> • September 151h through May 15th for trout streams. <br /> v March 151 through May 151 for ALL waters located south of state highway 29. <br /> v April 1 rt through June 1"for ALL waters located north of state highway 29. <br /> Note: Per s.NR 1.02(7),the Department identifies and classifies trout streams to ensure adequate protection <br /> and proper management of this unique resource. To determine if a waterway is a trout stream,you may <br /> use the Designated Waters Theme on DNR's Surface Water Data Viewer: http://dnrwi.00v/org/water/data <br /> __La. <br />
The URL can be used to link to this page
Your browser does not support the video tag.