My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/09/04 - SANITARY - SAN - Other
Burnett-County
>
Property Files
>
TOWN OF TRADE LAKE
>
23707
>
2008/09/04 - SANITARY - SAN - Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 3:47:21 PM
Creation date
10/4/2017 2:21:43 AM
Metadata
Fields
Template:
Property Files v2
Document Date
9/4/2008
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
23707
Pin Number
07-034-2-37-18-20-5 05-004-013000
Legacy Pin
034152002320
Municipality
TOWN OF TRADE LAKE
Owner Name
DE FILIPPIS TRUST
Property Address
12471 CEDAR POINT TER
City
GRANTSBURG
State
WI
Zip
54840
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mound System Maintenance and Operation Specifications <br /> Service Provider's Name A-1 SEPTIC I Phone 656-7007 <br /> POWTS Regulator's Name I BURNETT COUNTY ZONING I Phone 349-2138 <br /> System Flow and Load Parameters <br /> Design Flow-Peak 450 gpd Maximum Influent Particle Size 1/8 in <br /> Estimated Flow-Average 300 gpd Maximum BOD5 220 mg/L <br /> Septic Tank Capacity 1000 gal Maximum TSS 150 mg/L <br /> Soil Absorption Component Size 450.3 f:2 Maximum FOG 30 mg/L <br /> Type of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br /> Service Freouency <br /> Septic and Pump Tank Inspect and/or service once every 3 years <br /> Effluent Filter Should inspect and clean at least once every 3 years <br /> Pump and Controls Test once every 3 years <br /> Alarm Should test monthly <br /> Pressure System Laterals should be flushed and pressure tested eve 1.5 years <br /> Mound Inspect forponding and seepage once every 3 years <br /> Other <br /> Miscellaneous Construction and Materials Standards <br /> 1. Observation pipes are slotted and materials conform to Table Comm 84.30-1, have a watertight cap, <br /> and are secured in as shown in the mound component manual. <br /> 2. Dispersal cell aggregate conforms to Comm 84.30(6)(i), Wis. Adm. Code. <br /> 3. All gravity and pressure piping materials conform to the requirements in Comm 84, Wis.Adm. Code. <br /> 4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br /> 5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br /> and help reduce frost penetration. <br /> Lateral Tum-up Detail <br /> Finished ••••••••••••••• <br /> Grade yr <br /> 6-8" Diameter Lawn Threaded Cleanout <br /> Sprinkler Valve Box Plug or Ball Valve <br /> Distribution <br /> Lateral <br /> Long Sweep 90 or Two <br /> 45 Degree Bends Same <br /> Diameter as Lateral <br /> Project: Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.