Laserfiche WebLink
PRIVATE ONSITE WASTEWATER TREATMENT SYSTEM MANAGEMENT PLAN <br /> / <br /> SEPTIC TANK AND GRAVITY IN-GROUND SOIL ABSORPTION COMPONENT' <br /> Pursuant to Comm. 83.54 Wis. Adm. Code each Private Onsite Wastewater Treatment System (POWI'S) <br /> shall include information and procedures for maintaining the system within the parameters of Comm. 83 <br /> and 84, and the conditions of approval by the department, agent, or governmental unit. The approved <br /> plans and permits for system is on file at the county zoning office. <br /> This management plan complies with Comm. 83.54, Wis. Adm. Code and the In-Ground Soil Absorption <br /> Component Manual for Private Onsite Wastewater Treatment System SBD-10567-P (8.6/99). <br /> Table 1: System D sign Specifications <br /> Sani Permit Number <br /> Number of Bedrooms <br /> Design Flow—Peak d to <br /> Estimated Flow—Average d <br /> Septic Tank Capacity al <br /> Soil Absorption Component Size Fftl—)— <br /> Type of Wastewater <br /> Table 2: Soil Abs orption Component — Limits of Reliable Operation <br /> 11 Se ticTank Com onent Soil Absorption Component <br /> Desi Flow—Peak d F C <br /> Maximum Influent Particle Size in N/A 8 <br /> Maximum BODS m N/A 220 <br /> Maximum TSS m N/A 150 <br /> Maximum FOG /A 30 <br /> Table 3: Maintenance Schedule <br /> �— <br /> Septic Tank Inspect and service once every 3 years <br /> Outlet Filter Should inspect once a year and clean once every year <br /> Soil Absorption Component Inspect once every 3 years <br /> Dose Chamber <br /> Notice that the dose chamber may fill due to flow continuing during pump malfunc!, <br /> or power outages. One large dose when the power comes on or when the pump is repa re^ <br /> may cause the soil absorption component to have problems, In this situation, the pump <br /> ' chamber should be pumped by a licensed pumper before pump cycling begins or other <br /> measures shall bo used to dose the mound component with only the proper amount Of <br /> influent. This may include manual operation of the pump controls until such time the pump <br /> chamber has reached its normal level. Dose chambers are to be inspected routinely ano <br /> maintained when necessary In n000rdance with their approvals. <br /> I <br />