Laserfiche WebLink
i <br /> SAFETY&BUILDINGS DIVISION <br /> 201 E.Washington Avenue <br /> P.O.Boz 7969 <br /> Madison,Wisconsin 63707 <br /> State of Wisconsin <br /> Department of Industry,Labor and Human Relations <br /> Route 8, Box 8072 <br /> Hayward WI 54843 <br /> CENTRAL PLUMBING & HEATING <br /> NELS KOERPER <br /> 7845 CTH D <br /> WEBSTER WI 54893 <br /> RE: PLAN S96-20173 FEE RECEIVED: 60.00 <br /> POSSUM, KEVIN <br /> NE,SE,35,40,16W <br /> TOWN OF OAKLAND COUNTY OF BURNETT <br /> HOLDING TANK <br /> The Department has reviewed the above-referenced submittal. <br /> Conditional approval is hereby granted for the system plan submittal. All <br /> noted items must be corrected. The review and approval of the system is based <br /> on chapter 145, Wisconsin Statutes, and chapters ILHR 83 and 84, Wisconsin <br /> Administrative Code, and is contingent upon compliance with any stipulations <br /> shown on the plans. This system has not been reviewed for the code <br /> requirements set forth in chapter ILHR 82 or in chapters ILHR 50-64, Wisconsin <br /> Administrative Code. <br /> - A meter, with remote reading device, shall be installed by a properly <br /> licensed plumber, on the water system, that adequately measures the amount <br /> of water used by the structure, excluding hose bibs and wall hydrants, <br /> which do not discharge into the sanitary system. <br /> This plan submittal approval will expire two years from the approval date, or <br /> if a sanitary permit is obtained, plan approval will expire on the day the <br /> initial sanitary permit expires. The licensed plumber responsible for this <br /> installation shall keep one set of plans with the Department's stamp of <br /> approval at the construction site. The installer shall notify the appropriate <br /> inspector when inspections can be made. <br /> All permits required by the city, village, township or county shall be <br /> obtained prior to installation. <br /> SBD4928(R.01/91) <br />