Laserfiche WebLink
POWERWAVE Tower Mounted Amplifiers <br /> TTO8-19DB111-001 i TMA Twin Dual Band 850/1900 12 dB AISG 1.1 <br /> UL Frequency Range(MHz) 824-849/1850-1910 <br /> UL Rejection SMR Rejection,>30 dB @ 851 MHz <br /> UL Gain(dB) 12 <br /> UL Return Loss >18 dB <br /> UL Noise Figure <1.7 dB,Typical <br /> UL Output 3rd Order Intercept Polnt(dBm) +25,Typical <br /> UL Bypass Loss(dB) 2.5,Typical <br /> UL Max Input Power(dBm) +14 dBm <br /> DL Frequency Range(MHz) 869-894/1930-1990 <br /> DL Return Loss >.18 dB <br /> DL Inert lon Loss(dB) 850 MHz,0.4;1900 MHz,0.5 <br /> Intermodulation @ 2 x+43 dBm Tx cardere,in receive band,<-160 dBc,referred to antenna port <br /> Input Voltage(V) AISG Mode:10-30;Current alarm mode:8 47 <br /> Alarm Functionality AISG compatlbe or in case of no AISG command received current alarm mode 270-290 mA <br /> Power Consumption <1.8 W per branch @ 12V <br /> Power Handling,RMS 860:157 dam;1900:>55 dBm <br /> AISG Compatibility AISG 1.1 fully upgreadable to AISG 2.0(AISG version only dependent on loaded SW version) <br /> TT08-19DB112-001 has AISG 2.0 loaded from factory <br /> Dimension HxWxD mm(ti) 360x169x137mm(14.2"x6.7"x5.4") <br /> Weighglbs) <22 <br /> Colors Off white(NCS 1502-R) <br /> RF Connectors DIN 7/16 female,long neck <br /> Mounting Kit Moumfln2 kit for pole and wall is included <br /> Temperature Range 40'C to+65°C(40'F to+149°F) <br /> Operational ETS 300 019-14 <br /> Transportation ETS 300 019-1-2 <br /> Storage ETS 300019-1-1 <br /> Lightning Protection 3 kA 10/350 ps;20 kA(Shield) <br /> Housing Aluminum <br /> MTBF >1 million hours(per TMA) <br /> Ingram Protection IP65 and IP68 <br /> $ a <br /> Safety EN 60950 <br /> EMC 3GPP'TS 25.113 <br /> fr }t 7 <br /> 'AII specifications subject to change without notice.Contact your Powerwave representative for complete performance data. <br /> Rsv B Updeted:2010-02-04 ®Copyright 2010 Powenveve Technologies,Inc.Ali rights reserred. <br /> All specifications ere subject to change without notice.Please contact <br /> your Powemiom representative for complete performance date. <br />