Laserfiche WebLink
INSTRUCTIONS <br /> ' A sanitary permit is valid `or two (2j years. <br /> ve a tar', p ?it ria,, t e va + serer r rf;.ia t. _ .�- r,e r� •eva{ any new <br /> a ,F .a T. the ^OfW Nli be app;ia Lie. <br /> c%s'cns ro ih.s perr gi st. cr +t,f, ,Vs : y tine prrr.iii issue y a ty. <br /> 4. Charges in ownership r r P!„,mtter requires t San,-I- 0r,it Tra.--sfer'Penewal Form 'SBD c399i to be <br /> submitted to the county prior to nstal!aUur, <br /> 5 Onsite sewage systems mat be -,P-01 Tke septic .K r)ki,s must be purnped by a ! censed <br /> pumper whenever necessary, usually every 2 to 3 years. <br /> 6. If you have questions concerning your onsite sewage system, contac4 your local code administrator or the <br /> State of Wisconsin, Safety & Buildings Division, 608-266-3815. <br /> To be complete and accurate this sanitary permit application must include: <br /> I. Property owner's name and mailing address. Provide the legal description and parcel tax number(s) of <br /> where the system is to be installed. <br /> II. Type of building being served. Check only one and complete # of bedrooms if 1 or 2 Family Dwelling. <br /> III. Building use. I1 building type is Public, check all appropriate boxes that apply. <br /> IV. Type of permit. Check only one in line A. Complete line B if permit is for tank replacement, reconnection, or <br /> repair. <br /> V. Type of system. Check appropriate box depending on system type. <br /> VI. Absorption system information. Provide all information requested in #1-7. <br /> VII. Tank information Fill in the capacity of every new and/or existing tank, list the total gallons, number of <br /> tanks and manufacturer's name. Indicate prefab or site constructed and tank material. Complete for all <br /> septic, pump/siphon and holding tanks for this system. Check experimental approval only if tanks received <br /> experimental product approval from DILHR. <br /> VIII. Responsibility statement. Installing plumber is to fill in name, license number with appropriate prefix (e.g. <br /> MP, etc ), address and phone number. Plumber must sign application form <br /> IX. County/Department Use Only. <br /> X County/Department Use Only. <br /> Complete plans and specifications not smaller than 8f, x 11 inches must be submitted to the county. The <br /> plans must include the following: A) plot, plan, drawn to scale or with complete dimensions, location of <br /> holding tank(s), septic tank(s) or other treatment tanksbuilding sewers: wells; water mains/water service; <br /> streams and lakes; pump or siphon tanks; distribution boxes; soil absorption systems; replacement system <br /> areas; and the location of the building served; B) horizontal and vertical elevation reference points; <br /> C) complete specifications for pumps and controls; dose volume; elevation differences; friction loss; pump <br /> performance curve, pump model and pump manufacturer; D) cross section of the soil absorption system if <br /> required by the county; E) soil test data on a 115 form, and F) all sizing information. <br /> -------------------------------------------------------------------------------------------------------------------------------------------- <br /> GROUNDWATER SURCHARGE <br /> 1983 Wisconsin Act 410 included the creation of surcharges (fees) for a number of <br /> regulated practices which can effect groundwater. <br /> The monies collected through these surcharges are used for monitoring groundwater, ground- <br /> water contamination investigations and establishment of standards. <br /> SBD-8398(R.11/88) <br />