My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/16 - SANITARY - SAN - Other
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
18182
>
2015/09/16 - SANITARY - SAN - Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 8:27:15 AM
Creation date
10/5/2017 9:39:02 PM
Metadata
Fields
Template:
Property Files v2
Document Date
9/16/2015
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
18182
Pin Number
07-028-2-40-14-18-5 05-008-017000
Legacy Pin
028411802900
Municipality
TOWN OF SCOTT
Owner Name
ANDREW E & MELISSA A SCHOENKE
Property Address
28416 FONTAINE RD
City
WEBSTER
State
WI
Zip
54893
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mound System Maintenance and Operation Specifications <br /> Service Provider's Name STEVES SEPTIC Phone 715-566-1730 <br /> POWTS Regulator's Name BURNETT COUNTY ZONING Phone 715-349-2138 <br /> System Flow and Load Parameters <br /> Design Flow- Peak 450 gpd Maximum Influent Particle Size 1/8 in <br /> Estimated Flow-Average 300 gpd Maximum BOD5 220 mg/L <br /> Septic Tank Capacity 1000 gal Maximum TSS 150 mg/L <br /> Soil Absorption Component Size 450.3 ftZ Maximum FOG 30 mg/L <br /> Type of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br /> Service Frequency <br /> Septic and Pump Tank Inspect and/or service once every 3 years <br /> Effluent Filter Should inspect and clean at least once every 3 years <br /> Pump and Controls Test once every 3 years <br /> Alarm Should test month) <br /> Pressure System Laterals should be flushed and pressure tested every 1.5 years <br /> Mound Inspect for ponding and seepage once eveEy 3 years <br /> Other <br /> Miscellaneous Construction and Materials Standards <br /> 1. Observation pipes are slotted and materials conform to Table SPS 384.30-1, have a watertight cap, <br /> and are secured in as shown in the mound component manual. <br /> 2. Dispersal cell aggregate conforms to SPS 384.30 (6)(i), Wis.Adm. Code. <br /> 3. All gravity and pressure piping materials conform to the requirements in SPS 384, Wis.Adm. Code. <br /> 4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br /> 5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br /> and help reduce frost penetration. <br /> Lateral Turn-up Detail <br /> Finished M <br /> Grade l6-8" Diameter LawnThreaded Cleanout <br /> Sprinkler Valve BoxPlug or Ball Valve <br /> Distributiong Sweep 90 or Two <br /> 45 Degree Bends Same <br /> Diameter as Lateral <br /> Project: ANDY SHOENKE Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.