Laserfiche WebLink
Local Health Authority: Component Manufacturer(tank): <br /> Burnett Co.Zoning (/15)349-2138 Skew Pre-cast (800)924-8625 <br /> Douglas Co.Zoning (715)395-1380 Weiser Conoete (800)336 3416 <br /> Polk Co.Zoning (715)485.9279 <br /> Washburn Co.Zoning (715)968-2666 Licensed Pumpers/Filter Maintenance: <br /> A-1 Septic Service (715)356-7007 <br /> Chapman's Septic Service (/15)656-7113 <br /> Installer: Hopkins Sand&Gravel (715)866-4157 Steve's Septic Service (715)866-4195 <br /> Private Onsite Wastewater Treatment System Management Plan <br /> Distribution System Absorption Component <br /> This management plan complies with Comm 83.54,Wis.Adm.Code,and the appropriate Soil Absorption Component Manual for Private <br /> Onsite Wastewater Systems. The specific component manual for this P.O.W.T.S. is: <br /> Table 1:System Design Specifications <br /> Sanitary Permit Number: Septic Tank Capacity(gal): sm <br /> Number of Bedrooms: 2- Dose Tank Capacity(gal): All <br /> Design Flow-Peak(gpd): �Vo Soil Absorption Component Size(Sq. Ft.):4_42 <br /> Estimated Flow-Average(gpd):200 Type of Wastewater: Domestic <br /> Table 2: Soil Absorption Component-Limits of Reliable Operation <br /> Septic Tank Soil Absorption <br /> Component Component <br /> Design Flow-Peak(gpd) <br /> Maximum Influent Particle Size(in) n/a 1/8 <br /> Maximum BOD (mg/L) n/a 220 <br /> Maximum TSS (mg/L) n/a 150 <br /> Maximum FOG n/a 30 <br /> Septic Tank Table 3: Maintenance Schedule <br /> P Inspect and/or service every 3 years. <br /> Outlet Should inspect once a year and clean once every 3 years. <br /> Soil Absorption Component Inspect once every 3 years. <br /> Contingency Plan:Use alternate site if available or remove distribution pipe,aggregate or chambers&clogging mat.. Replace distribution pipe, <br /> aggregate or chambers&C-33 fine aggregate. <br /> The septic tank shall be maintained by an individual ceied to service septi:Septic <br /> under rtifs.281.48, Stats. The contents of the septic tank shall be disposed of in <br /> accordance with NR 113, Wis.Adm. Code(Servloing Septi:or Holding Tanks, Pumping Chambers. Grease Interceptors, Seepage Beds, Seepage Pits, Seepage <br /> Trenches. Privies, or Portable Restrooms). <br /> The operating condition of the septi:tank and outlet fitter shag be assessed at least once every 3 years by Inspection.The outlet finer shall be cleaned as necessary <br /> to ensure proper operation.The fitter cartridge should not be removed unless provisions are made to retain solids in the tank that may slough off the tiger when <br /> removed from its enclosure. If the tiger is equipped with an alarm,the fitter shall be serviced g the alarm is activated continuously. Intermittent finer alarms may <br /> Indicate surge flows or an Impending continuous alarm.The septic tank shall have its contents removed when the volume of scum and sludge in the tank exceeds 1/3 <br /> the liquid volume of the tank. If the contents of the tank are not removed at the time of assessment, maintenance personnel shall advise the owner of when the next <br /> service needs to be performed to maintain less than maximum scum and sludge accumulation in the tank. <br /> No one should enter a septic or other treatment or holding tank for any reason without being in full compliance with OSHA standards for entering <br /> a confined space.The atmosphere within the septic or other treatment or holding tank may contain lethal gases,and rescue of a person from the <br /> Interior of the tank may be dlfficutt or impossible. <br /> Tank abondonment shall be in accordance with Comm 83.33, Wis.Adm. Code when the tank is no longer used as a P.O.W.T.S.component. <br /> Notice that the dose chamber may till due to lbw continuingBurin Dose Chamber <br /> repaired may cause the mound component to have probles. In this situation,the lopump n or pchamberwer ashould be pumpeds.One large dose when the power comes on or when the pump is <br /> or other measures shall be used to dose the mound component with only the proper amount of influent.This ay include manualeoperationrof the pfore ump pump <br /> until <br /> such time the pump chamber has reached its normal level. Dose chambers are to be inspected routinely and maintained when necessary in accordance with their <br /> approvals. <br /> Soil Absorption Component <br /> The soil absorption component serving this structure is designed to accept domestic wastewater from a residential facility. The limits of operation of this component <br /> are shown in Table 2. <br /> The longevity of a soil absorption component depends greatly on proper and timely maintenance,and system use within or below the limits of reliable operation. Good <br /> water conservation practices by all occupants and the installation of water conserving plumbing fixtures are key factors in extending the useful Irfe of this component. <br /> The soil absorption component's operation must be assessed by inspection at least once every three years. The inspection shall Include recording the levels of <br /> ponding, g any, in the observation pipes,and a visual inspection for any evidence of surface seepage or discharge from the component.On steeply sloping sites, <br /> areas of erosion should be indentkied and reported to the owner for repair.The surface discharge of domestic wastewater or sewage from th system Is prohibited and <br /> considered a human health hazard. <br /> Tragi:around or over the soil absorption component should be avoided particularly during winter months.The compaction or removal of snow cover over the <br /> component may lead to hydraulic failure by freezing.This type of failure is usually temporary, but is difficult or impossible to repair until weather conditions improve. In <br /> general, soil compaction over this component will reduce diffusion of oxygen into the soil and dispersal cell, which may lead to more Intense. and earlier, organic <br /> clogging of the soil. <br /> Plantings of deep-rooted trees and shrubs directly over or within ten feet of the component should be avoided since root intrusion into the component may obstruct <br /> wastewater fim <br /> etwork <br /> Partial plugging of the distribution network may be detected by extremely long dosing time. The ends of the distribution laterals should be exposed and the pump <br /> activated togflush out any solid material.The liquid that is flushed out of the laterals is to be directed back Into the distribution cell or into an acceptable container. If <br /> necessary,the laterals can be cleaned. <br />