Laserfiche WebLink
at least five days after construction. You must also have a copy of the permit and <br />approved plan available at the project site ffi all groes until the protect is complete. <br />8. Your acceptance of this permit and efforts to begin work on this protect signify that <br />you have read, understood and agreed to follow all conditions of this pevmH. <br />9. You must submit a series of photographs to the Department, within one week of <br />canpleting work on the she. The photographs must be taken from different vantage <br />paints and depict all work authorized by this permit. <br />10. You, your agent, and any involved contractors or consultants may be considered a <br />party to the violation pursuant to Section 30.292, Wis. Stats., for any violations of <br />Chapter 30, Wscpnsm Statutes, or this permit. <br />11. Construction shall be accomplished in such a manner as to minimize erosion and <br />siltation into surface waters. Erosion control measures (such as silt fence and strew <br />bales) must meet w exceed the technical standards of ch. NR 151, War. Adm. Code. <br />The technical standards are found at: <br />hdp:l/dnr.WomAopicJstormwaterlslandalds/wnsl standards. html. <br />12. All equipment used for the project including but not limited to tracked vehicles, <br />barges, boats, hoses, sheet pile and pumps shall be de -contaminated for invasive <br />and exotic viruses and species prior to use and after use. <br />The following steps must be taken eirery tim you move your equipment to avoid <br />transporting invasive and exotic vimses and species. To the extent practicable, <br />equipment and gear used an infested waters shall not be used on other non -infested <br />waters. <br />1. Inspect and remove aquatic plants, animals, and mud from your equipment. <br />2. Dram all water from your equipment that comes in contact with intestetl waters, <br />including but not limited to tracked vehicles, barges, baste, hoses, sheet pile and <br />pumps. <br />3. Dispose of aquatic planta, animals in the trash. Never release or transfer aquatic <br />plants, animals or water from one waterbody to another. <br />4. Wash your aqulpmeM with hot (>1400 F) andlor high pressure water, <br />-OR- <br />Allow your equipment to dry thoroughly for 5 days. <br />FINDINGS OF FACT <br />1. Town of L Follede has filed an application for a p Oto replace two where en <br />Warner Lake Road at Warner Lake, in the Tam of La Follette, Burnett County, oleo <br />described as being in the SE114 of Section 4, Township W North, Range 15 West. <br />