My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/03/17 - SANITARY - SAN - Other (3)
Burnett-County
>
Property Files
>
TOWN OF OAKLAND
>
13951
>
2016/03/17 - SANITARY - SAN - Other (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:30:28 AM
Creation date
12/7/2017 2:19:37 PM
Metadata
Fields
Template:
Property Files v2
Document Date
3/17/2016
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
13951
Pin Number
07-020-2-40-16-33-5 05-003-012000
Legacy Pin
020433305600
Municipality
TOWN OF OAKLAND
Owner Name
HERZL CAMP ASSOC INC
Property Address
7260 MICKEY SMITH PKWY
City
WEBSTER
State
WI
Zip
54893
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
!Nf i I I I'�ik <br /> Mound System Maintenance and Operation Specifications <br /> Service Provider's Name BURNETT COUNTY ZONING Phonel 715 349 2138 <br /> POWTS Regulator's Name STEVES SEPTIC Phone 715 566 1730 <br /> System Flow and Load Parameters <br /> Design Flow- Peak 1200 gpd Maximum Influent Particle Size 1/8 in <br /> Estimated Flow-Average 800 gpd Maximum BOD5 220 mg/L <br /> Septic Tank Capacity 3280 gal Maximum TSS 150 mg/L <br /> Soil Absorption Component Size 1200 ft2 Maximum FOG 30 mg/L <br /> Tyne of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br /> Service Freauencv <br /> Septic and Pump Tank Inspect and/or service once.every 3 years <br /> Effluent Filter Should inspect and clean at least once every 3 years <br /> Pump and Controls Test once every 3 years <br /> Alarm Should test month) <br /> Pressure,system aterals should be flushed and pressure tested every 1.5 years <br /> Mound Inspect for ponding and seepage once every 3 years <br /> Other <br /> Miscellaneous Constructlon and Materials Standards <br /> 1. Observation pipes are slotted and materials conform to Table Comm 84.30-1, have a watertight cap, <br /> and are secured in as shown in the mound component manual. <br /> 2. Dispersal cell aggregate conforms to Comm 84.30 (6)(i), Wis.Adm. Code. <br /> 3. All gravity and pressure piping materials conform to the requirements in Comm 84, Wis.Adm. Code. <br /> 4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br /> 5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br /> and help reduce frost penetration. <br /> Lateral Turn-up Detail <br /> Finished ••.. .....ssZ <br /> Grade6-8"Diameter LawnThreaded Cleanout <br /> Sprinkler Valve BoxPlug or Ball Valve <br /> Distributiong Sweep 90 or Two <br /> 45 Degree Bends Same <br /> Diameter as Lateral <br /> Project: HERZL CAMP Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.