Laserfiche WebLink
!Nf i I I I'�ik <br /> Mound System Maintenance and Operation Specifications <br /> Service Provider's Name BURNETT COUNTY ZONING Phonel 715 349 2138 <br /> POWTS Regulator's Name STEVES SEPTIC Phone 715 566 1730 <br /> System Flow and Load Parameters <br /> Design Flow- Peak 1200 gpd Maximum Influent Particle Size 1/8 in <br /> Estimated Flow-Average 800 gpd Maximum BOD5 220 mg/L <br /> Septic Tank Capacity 3280 gal Maximum TSS 150 mg/L <br /> Soil Absorption Component Size 1200 ft2 Maximum FOG 30 mg/L <br /> Tyne of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br /> Service Freauencv <br /> Septic and Pump Tank Inspect and/or service once.every 3 years <br /> Effluent Filter Should inspect and clean at least once every 3 years <br /> Pump and Controls Test once every 3 years <br /> Alarm Should test month) <br /> Pressure,system aterals should be flushed and pressure tested every 1.5 years <br /> Mound Inspect for ponding and seepage once every 3 years <br /> Other <br /> Miscellaneous Constructlon and Materials Standards <br /> 1. Observation pipes are slotted and materials conform to Table Comm 84.30-1, have a watertight cap, <br /> and are secured in as shown in the mound component manual. <br /> 2. Dispersal cell aggregate conforms to Comm 84.30 (6)(i), Wis.Adm. Code. <br /> 3. All gravity and pressure piping materials conform to the requirements in Comm 84, Wis.Adm. Code. <br /> 4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br /> 5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br /> and help reduce frost penetration. <br /> Lateral Turn-up Detail <br /> Finished ••.. .....ssZ <br /> Grade6-8"Diameter LawnThreaded Cleanout <br /> Sprinkler Valve BoxPlug or Ball Valve <br /> Distributiong Sweep 90 or Two <br /> 45 Degree Bends Same <br /> Diameter as Lateral <br /> Project: HERZL CAMP Page 5 of 10 <br />