My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/04/24 - SANITARY - SAN - Repl Mound <24" - SAN-18-19
Burnett-County
>
Property Files
>
TOWN OF LINCOLN
>
10814
>
2018/04/24 - SANITARY - SAN - Repl Mound <24" - SAN-18-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 12:10:23 AM
Creation date
4/24/2018 1:55:34 PM
Metadata
Fields
Template:
Property Files v2
Document Date
4/24/2018
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Repl Mound <24"
County Permit Number
SAN-18-19
State Permit Number
602717
Tax ID
10814
Pin Number
07-016-2-39-17-24-4 04-000-013000
Legacy Pin
016342402900
Municipality
TOWN OF LINCOLN
Owner Name
AMY S & ANTHONY C ROACH
Property Address
8204 COUNTY RD D
City
WEBSTER
State
WI
Zip
54893
Previous Owners
LAURA ALBERG TERRY L SHEFFLER SR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mound System Maintenance and Operation Specifications <br />Service Provider's Name STEVES SEPTIC Phone715-566-1730 <br />POWTS Regulator's Name BURNETT COUNTY ZONING Phone 715-349-2138 <br />System Flow and Load Parameters <br />Design Flow - Peak 450 gpd Maximum Influent Particle Size 1/8 in <br />Estimated Flow - Average 300 gpd Maximum BOD5 220 mg/L <br />Septic Tank Capacity 1000 gal Maximum TSS 150 mg/L <br />Soil Absorption Component Size 450.3 ftZ Maximum FOG 30 mg/L <br />Type of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br />Septic and Pump Tank <br />Effluent Filter <br />Pump and Controls <br />Alarm <br />Pressure System <br />Mound <br />Other <br />Service Frequency <br />Inspect and/or service once every 3 years <br />Should inspect and clean at least once eve 3 years <br />Test once every 3 years <br />Should test monthly <br />Laterals should be flushed and pressure tested every 1.5 years <br />Inspect for ponding and seepage once every 3 years <br />Miscellaneous Construction and Materials Standards <br />1. Observation pipes are slotted and materials conform to Table SPS 384.30-1, have a watertight cap, <br />and are secured in as shown in the mound component manual. <br />2. Dispersal cell aggregate conforms to SPS 384.30 (6)(i), Wis. Adm. Code. <br />3. All gravity and pressure piping materials conform to the requirements in SPS 384, Wis. Adm. Code. <br />4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br />5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br />and help reduce frost penetration. <br />Lateral Turn -up Detail <br />Finished ••............ ............... <br />Grade vl <br />6-8" Diameter Lawn Threaded Cleanout <br />Sprinkler Valve Box Plug or Ball Valve <br />Distribution <br />Long Sweep 90 or Two <br />45 Degree Bends Same <br />Diameter as Lateral <br />Project: TERRY SHEFFLER Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.