My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/05/16 - OTHER - (NA) - State Permits
Burnett-County
>
Property Files
>
TOWN OF JACKSON
>
5674
>
2018/05/16 - OTHER - (NA) - State Permits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 9:50:55 PM
Creation date
5/16/2018 9:07:35 AM
Metadata
Fields
Template:
Property Files v2
Document Date
5/16/2018
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
State Permits
Tax ID
5674
Pin Number
07-012-2-40-15-25-5 05-004-023000
Legacy Pin
012422506100
Municipality
TOWN OF JACKSON
Owner Name
DAVID J GROPPOLI
Property Address
27747 THOMPSON BAY RD
City
WEBSTER
State
WI
Zip
54893
Previous Owners
DAVID J GROPPOLI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF THE ARMY <br />ST. PAUL DISTRICT, CORPS OF ENGINEERS <br />180 FIFTH STREET EAST, SUITE 700 <br />ST. PAUL, MN 55101-1678 <br />OREPLY TO ATTENTION OF <br />REGULATORY BRANCH MAY 15 2018 <br />Regulatory File No. 2018-00977-JMB <br />David Groppoli <br />2228 Riverwood Place <br />St. Paul, MN 55104 <br />Dear Mr. Groppoli: <br />This correspondence is in regard to your pre -construction notification (PCN) requesting <br />Department of the Army (DA) authorization to discharge fill material (297 SF or 30 cubic yards) <br />on the bed of (North) Sand Lake for the purpose of bank stabilization. Work for the project will <br />Include the placement of filter fabric and rock (8-12) along 99 feet of shoreline, and will be <br />- -conducted-during the winter"months under frozen conditions. -The project -site Is locatedin- -_._ <br />Section 25, Township 40 North, Range 15 West, Burnett County, Wisconsin. <br />Nationwide (NWP) and Regional General (RGP) permits. The work that you describe appears to <br />fit the general activity information described in NWP 13, Bank Stabilization. Based on the <br />information submitted to our agency, it appears that no application or notification to the St. Paul <br />District Corps of Engineers is required for your project. <br />This letter is not a verification of DA eligibility, but an indication that your project may meet <br />the requirements for DA eligibility. It is your responsibility to ensure that the work is performed in <br />accordance with the NWP terms and General Conditions before starting work. It is also <br />incumbent on you to verify that your activity has received a required 401 water quality <br />certification or waiver from the Wisconsin Department of Natural Resources (WDNR) <br />prior to the start of work in waters of the U.S. If a 401 water quality certification has not been <br />issued for your activity, you are responsible for contacting the 401 certifying agency listed <br />below. A full list of applicable NWP terms, conditions and all issued 401 water quality <br />certifications may be found by visiting our website at <br />http://www.mvp.usace.army.mil/Missions/Regulatory/Permitting-Process-Procedures/. <br />Failure to comply with any of the listed conditions could result in the Corps initiating an <br />enforcement action. <br />We did not determine whether wetlands or other waters in the site are subject to Corps <br />jurisdiction. You may request a jurisdictional determination from the Corps contact indicated <br />below. It is not necessary to request a jurisdictional determination. <br />
The URL can be used to link to this page
Your browser does not support the video tag.