Laserfiche WebLink
Surveyor checks these after GIS review <br />!"Math check each lot and add all parts to be sure totals are correct. <br />v---Does <br />'Does the proposed CSM fit with the parcel map, if available? <br />✓Are all structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />on the site and adjoiners shown? BC Ord. 58-52 (b) <br />41—boes the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />RPL Review — Surveyor / Zoning looks into any issues C O/ � <br />Reconciles with Real Property Listing — Comments <br />Cy Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />r <br />e additional parcels being created? <br />e owner's certificates from all parties of interest included? <br />s the CSM been approved by all approving authorities like a plat? <br />AA ,, Is it monumented the same as a plat with bigger monuments at corners? <br />ry Has there been an adjacent CSM recorded with 4 parcels of 1 '/z acres each or less within a period of 5 years? <br />236.02 (12) <br />—N—Is the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />","Parcel Identification Number(s): I Q i i aL, / '7 Z)Z' ) <br />��Lot Number with improvements — Comments <br />Treasurer Review (et Surveyor know bout delinquency) <br />Treasurer Check for Taxes owed 'kie. <br />0/90 <br />SIGNATURE OF REVIEWER: �" �r ""� DATE: r� �Z <br />\production\SURVEY MISC rrEMS\Review Docs\CSM checksheet May_2018 <br />