Laserfiche WebLink
Cross-section of an In -ground Component Cell <br />Slope % _ <br />Nonpressurized perforated drain piping shall conform to one of the standards listed in Table 84.30-4 <br />Geotextile Fabric to meet DsPs - 384.30(6)(g), Wis Adm.Code Requirements <br />Stone Aggregate to meet D6P5 384.30(6)(i), Wis Adm. Code Requirements <br />Minimum of 12" of aggregate to include 2" over the top of distribution pipe. <br />Minimum of 12" of cover over top distribution cell <br />Two observation/vent pipes to be provided per cell <br />0 o Svwk�� <br />oc, Ven' <br />Not To Scale <br />KES 12/14/00 <br />36" <br />