Laserfiche WebLink
Surveyor checks these after GIS review <br />Y Math check each lot and add all parts to be sure totals are correct. <br />c,Does the proposed CSM fit with the parcel map, if available? <br />'1­�re all structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />on the site and adjoiners shown? BC Ord. 58-52 (b) <br />_L/Does the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />RPL Review — Surveyor / Zoning looks into any issues <br />"Reconciles with Real Property Listing — Comments <br />Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />Are additional parcels being created? <br />Are owner's certificates from all parties of interest included? <br />Has the CSM been approved by all approving authorities like a plat? <br />Is it monumented the same as a plat with bigger monuments at corners? <br />Has there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of 5 years? <br />236.02 (12) <br />Is the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />✓Parcel Identification Number(s): <br />Lot Number with improvements —Comments Lp, 4 t = <br />i <br />Treasurer Revif�y — (Let Surveyor know about delinquency) <br />Treasurer Check for Taxes owed <br />L 5/ o /8 <br />SIGNATURE OF REVIEWER: DATE: Ahe: <br />\production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />