Laserfiche WebLink
a <br />Surveyor checks these after GIS review <br />✓Math check each lot and add all parts to be sure totals are correct. <br />Does the proposed CSM fit with the parcel map, if available? <br />✓Are all structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />on the site and adjoiners shown? BC Ord. 58-52 (b) <br />,v1 Does the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />RPL Review — Surveyor / Zoning looks into any issues <br />VReconciles with Real Property Listing — Comments <br />JN Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />Are additional parcels being created? <br />Are owner's certificates from all parties of interest included? <br />Has the CSM been approved by all approving authorities like a plat? <br />Is it monumented the same as a plat with bigger monuments at corners? <br />Has there been an adjacent CSM recorded with 4 parcels of 1 '/z acres each or less within a period of 5 years? <br />236.02 (12) <br />::PNJ Is the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />Parcel Identification Number(s):`�, Z ' <br />VLot Number with improvements — Comments <br />Treasurer Revie" (Let Surveyor kriow about delinquency) <br />Treasurer Check for Taxes owed <br />0zr r- /U/l�/is <br />SIGNATURE OF REVIEWER: DATE: _ 7 I <br />91" <br />\production\SURVEY\MISC TTEMS\Review Docs\CSM checksheet May_2018 <br />