Laserfiche WebLink
Surveyor checks these after GIS review <br />Math check each lot and add all parts to be sure totals are correct. <br />6 <br />6�oes the proposed CSM fit with the parcel map, if available? <br />V/A a all structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />,', // l�oiin the site and adjoiners shown? BC Ord. 58-52 (b) <br />/d�oes the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />IDIRPL Review – Surveyor / Zoning looks into any issues ; <br />reconciles with Real Property Listing – Comments <br />Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />VIs <br />e additional parcels being created? <br />e owner's certificates from all parties of interest included? <br />sthe CSM been approved by all approving authorities like a plat? <br />it monumented the same as a plat with bigger monuments at corners? <br />Has there been an adjacent CSM recorded with 4 parcels of 1 %2 acres each or less within a period of 5 years? <br />236.02 (12) <br />~) Is the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />Parcel Identification Number(s): n ''Xl _ �. , 4 <br />Lot Number with improvements – Comments l 1 — <br />Treasurer Re a ,�– (Let Surveyor know about delinquency) <br />Treasurer Check for Taxes owed aA:,V`�PL FVLL <br />1.k <br />SIGNATURE OF REVIEWER: <br />\production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />