Laserfiche WebLink
Surveyor checks these after GIS review <br />V MM th check each lot and add all parts to be sure totals are correct. <br />V Does the proposed CSM fit with the parcel map, if available? <br />✓ Are all structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />e site and adjoiners shown? BC Ord. 58-52 (b) <br />Does the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />RPL Review — Surveyor / Zoning looks into any issues 11)2,1 <br />✓Reconciles with Real Property Listing — Comments 119 <br />N Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />Are additional parcels being created? <br />Are owner's certificates from all parties of interest included? <br />Has the CSM been approved by all approving authorities like a plat? <br />Is it monumented the same as a plat with bigger monuments at corners? <br />Has there been an adjacent CSM recorded with 4 parcels of 1 '/z acres each or less within a period of 5 years? <br />236.02 (12) <br />Is the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />✓Parcel Identification Number(s): 1 ?211 () 10 --�3m� <br />`Lot Number with improvements — Comments <br />L.z--f 2� -- 2 �?Xz7 o 1d �J 1E, �<LA <br />Treasurer Review — (Let Surve r know about delinquency) <br />Treasurer Check for Taxes owed o%D�% �(&Q.l,(,�(� <br />/1100h <br />SIGNATURE OF REVIEWER: DATE: <br />\production\SURVEYNISC ITEMS\Review Docs\CSM checksheet May_2018 <br />ME`�� <br />