Laserfiche WebLink
3x ry.- #3q6 <br /> DEPARTMENT OF HOMELAND SECURITY-FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B.NO.1660-0015 <br /> PROPERTY INFORMATION FORM Expires February 28,2014 <br /> PAPERWORK BURDEN DISCLOSURE NOTICE <br /> Public reporting burden for this data collection is estimated to average 1.63 hours per response. The burden estimate includes the time for reviewing instructions, <br /> searching existing data sources,gathering and maintaining the needed data,and completing and submitting the form. This collection is required to obtain or retain <br /> benefits. You are not required to respond to this collection of information unless a valid OMB control number is displayed on this form. Send comments regarding the <br /> accuracy of the burden estimate and any suggestions for reducing this burden to:Information Collections Management,Department of Homeland Security,Federal <br /> Emergency Management Agency,1800 South Bell Street,Arlington,VA 20598-3005,Paperwork Reduction Project(1660-0015). NOTE:Do not send your completed <br /> form to this address. <br /> This form may be completed by the property owner,property owner's agent,licensed land surveyor,or registered professional engineer to support a request for a <br /> Letter of Map Amendment(LOMA),Conditional Letter of Map Amendment(CLOMA),Letter of Map Revision Based on Fill(LOMR-F),or Conditional Letter of Map <br /> Revision Based on Fill(CLOMR-F)for existing or proposed,single or multiple lots/structures. In order to process your request,all information on this form must be <br /> completed in its entirety,unless stated as optional. Incomplete submissions will result in processing delays. Please check the item below that describes your request: <br /> ❑ LOMA A letter from DHS-FEMA stating that an existing structure or parcel of land that has not been elevated <br /> by fill(natural grade)would not be inundated by the base flood. <br /> ❑ CLOMA A letter from DHS-FEMA stating that a proposed structure that is not to be elevated by fill(natural <br /> grade)would not be inundated by the base flood if built as proposed. <br /> ® LOM R-F A letter from DHS-FEMA stating that an existing structure or parcel of land that has been elevated by <br /> fill would not be inundated by the base flood. <br /> A letter from DHS-FEMA stating that a parcel of land or proposed structure that will be elevated by fill <br /> ❑ CLOM R-F would not be inundated by the base flood if fill is placed on the parcel as proposed or the structure is <br /> built as proposed. <br /> Fill is defined as material from any source(including the subject property)placed that raises the ground to or above the Base Flood Elevation(BFE). The common <br /> construction practice of removing unsuitable existing material(topsoil)and backfilling with select structural material is not considered the placement of fill if the <br /> practice does not alter the existing(natural grade)elevation,which is at or above the BFE. Fill that is placed before the date of the first National Flood Insurance <br /> Program(NFIP)map showing the area in a Special Flood Hazard Area(SFHA)is considered natural grade. <br /> Has fill been placed on your property to raise 03/2008 <br /> ground that was previously below the BFE? ® Yes ❑ No If yes,when was fill placed? <br /> mm/dd/yyyy <br /> Will fill be placed on your property to raise <br /> ground that is below the BFE? ❑ Yes* ® No If yes,when will fill be placed? <br /> mm/dd/yyyy <br /> *If yes,Endangered Species Act(ESA)compliance must be documented to FEMA prior to issuance <br /> of the CLOMR-F determination(please refer page 4 to the MT-1 instructions). <br /> 1. Street Address of the Property(if request is for multiple structures or units,please attach additional sheet referencing each address and enter <br /> street names below): <br /> 7504 Lagoon Lane, Webster, WI 54893 <br /> 2. Legal description of Property(Lot,Block,Subdivision or abbreviated description from the Deed): <br /> Big Yellow Lake Estates Lot 4, Sec 29 T40N R16W, Oakland Township, Burnett County, WI <br /> 3. Are you requesting that a flood zone determination be completed for(check one): <br /> N Structures on the property? What are the dates of construction? 07/2008 (MM/YYYY) <br /> ❑ A portion of land within the bounds of the property?(A certified metes and bounds description and map of the area to be <br /> removed,certified by a licensed land surveyor or registered professional engineer,are required.For the preferred format of <br /> metes and bounds descriptions,please refer to the MT-1 Form 1 Instructions.) <br /> ❑ The entire legally recorded property? <br /> 4. Is this request for a(check one): <br /> I) Single structure <br /> ❑ Single lot <br /> ❑ Multiple structures(How many structures are involved in your request?List the number: ) <br /> ❑ Multiple lots(How many lots are involved in your request?List the number: ) <br /> DHS-FEMA Form 086-0-26,FEB 11 Property Information Form MT-1 Form 1 Page 1 of 2 <br />