My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/10/20 - SANITARY - SAN - New Mound <24" - 29516
Burnett-County
>
Property Files
>
TOWN OF LAFOLLETTE
>
32005
>
2004/10/20 - SANITARY - SAN - New Mound <24" - 29516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 2:58:29 PM
Creation date
1/23/2020 2:53:08 PM
Metadata
Fields
Template:
Property Files v2
Document Date
10/20/2004
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
New Mound <24"
County Permit Number
29516
Tax ID
32005
Pin Number
07-014-2-38-15-36-3 02-000-012001
Municipality
TOWN OF LAFOLLETTE
Owner Name
JASON L & ELIZABETH J SYVERSON
Property Address
22582 ROOT RD
City
FREDERIC
State
WI
Zip
54837
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mound and Pressure Distribution Component Design <br /> Design Worksheet <br /> Site Information <br /> (r or c) R Residential or Commercial Design Note: Sand fill(D)calculations assume a <br /> 300.00 Estimated Wastewater Flow(gpd) Table 83-44-3 in-situ soil treatment for fecal <br /> 1.50 Peaking Factor(e.g. 1.5 = 150%) colifonn of<=36 inches. <br /> 450.00 Design Flow(gpd) <br /> 14.00 Site Slope (%) <br /> 94.20 Contour Line Elevation (ft) <br /> 41.00 Depth to Limiting FaG.or(in) <br /> 0.70 In-situ Soil.Application Rate(gpd/ft2) <br /> Distribution Cell Information <br /> 75.001 Dispersal Cell Length Along Contour(ft) = 6.00 Cell Width (ft) <br /> 1.00 Dispersal Cell Design Loading Rate (gpd/ft2) <br /> 1 I Influent Wastewater Quality(1 or 2) Are the laterals the highest point <br /> in the distribution <br /> Pressure Disribution Information network? Enter Y or N <br /> (c or e) c Center or End Manifold <br /> 3.00 Lateral Spacing (ft) If N above, enter the elevation (ft)� <br /> 4 Number of Laterals of the highest point. F <br /> 0.166 Orifice Diameter(in) (-a.g. 0.25) <br /> 2.00 Estimated Orifice Spacing (ft) = 6.25 ft2/orifice <br /> 2.00 Forcemain Diameter(in) <br /> 95.00 Forcemain Length (ft) Does the forcemain drain back? Y_� <br /> 84.00 Pump Tank Elevation (ft) Enter Y or N <br /> 4.55 System Head (ft)x 1.j 15.50 Forcemain Drainback(gal) <br /> 10.37 Vertical Lift(ft) 67.44 5x Void Volume (gal) <br /> 2.96 Friction Loss(ft) 82.93 Minimum Dose Volume(gal) <br /> 17.88 Total Dynamic Head (tt) 38.77 System Demand (gpm) <br /> Lateral Diameter Selection Manifold Diameter Selection <br /> in. dia. options choice in. dia. options choice <br /> 0.75 1.25 x <br /> 1.00 1.50 x x <br /> 1.25 x 2.00 <br /> 1.50 x x 3.00 <br /> 2.00 x <br /> 3.00 x <br /> Gallons/Inch Calculator(optional) <br /> Treatment Tank Information Total Tank Capacity(gal) <br /> 1000.001 Septic Tank Capacity t gal) Total Working Liquid Depth (in) <br /> Wieser Concrete jManufacturBr gal/in (enter result in cell 849) <br /> Dose Tank Information Effluent Filter Information <br /> 602.821 Dose Tank Capacity(gal) jZabel Filter Manufacturer <br /> 11.821 Dose Tank Volume (gal/in) A-100 Filter Model Number <br /> Wieser Concrete INIanufacturer <br /> Project: Erling Syverson Mound Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.