Laserfiche WebLink
Mound Systern Maintenance and Operation Specifications <br /> Service Provider's Name Frederic Area Sanitation Phone (715) 327-8408 <br /> POWTS Regulator's NameE Burnett County Zoning Phone (715) 349-2138 <br /> System flow and Load Parameters <br /> Design Flow- Peak 450 gF>d Maximum Influent Particle Size 1/8 in <br /> Estimated Flow-Average 300 gpd Maximum BOD5 220 mg/L <br /> Septic Tank Capacity 1000 gzil Maximum TSS 150 mg/L <br /> Soil Absorption Component Size 450 ft2 Maximum FOG 30 mg/L <br /> Type of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br /> Service Frequency <br /> Septic and Pump Tank I is ect and/or service once every 3 years <br /> Effluent Filter Should inspect and clean at least once every 3 ears <br /> Pump and Controls Test once every 3 years <br /> Alarm Should test month! <br /> Pressure System Laterals should be flushed and pressure tested every 1.5 years <br /> Mound Inspect for ponding and see a e once every 3 years <br /> Other <br /> Miscellaneous Construction and Materials Standards <br /> 1. Observation pipes are slotted and material::conform to Table Comm 84.30-1, have a watertight cap, <br /> and are secured in as shown in the mound component manual. <br /> 2. Dispersal cell aggregate conforms to Comm 84.30(6)(i), Wis. Adm. Code. <br /> 3. All gravity and pressure piping materials conform to the requirements in Comm 84, Wis. Adm. Code. <br /> 4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br /> 5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br /> and help reduce frost penetration. <br /> Lateral Turn-up Detail <br /> Finished .............. <br /> Grade .. . . . <br /> 6-8" Diameter Lawn - ► Threaded Cleanout <br /> Sprinkler Valve Box . . . . Plug or Ball Valve <br /> Distribution <br /> Lateral <br /> Long Sweep 90 or Two <br /> 45 Degree Bends Same <br /> Diameter as Lateral <br /> Project: Erling Syverson Mound Page 5 of 8 <br />