Laserfiche WebLink
at least five days after construction. You must also have a copy of the permit and <br /> approved plan available at the project site at all times until the project is complete. <br /> 8. Your acceptance of this permit and efforts to begin work on this project signify that <br /> you have read, understood and agreed to follow all conditions of this permit. <br /> i <br /> 9. You must submit a series of photographs to the Department, within one week of <br /> completing work on the site. The photographs must be taken from different vantage <br /> points and depict all work authorized by this permit. i <br /> 10.You, your agent, and any involved contractors or consultants may be considered a <br /> party to the violation pursuant to Section 30.292, Wis. Stats., for any violations of <br /> Chapter 30, Wisconsin Statutes, or this permit. <br /> 11.Construction shall be accomplished in such a manner as to minimize erosion and <br /> siltation into surface waters. Erosion control measures (such as silt fence and straw <br /> bales) must meet or exceed the technical standards of ch. NR 151, Wis. Adm. Code. <br /> The technical standards are found at: <br /> http://dnr.wi.aov/topic/stormwater/standards/const standards.html . <br /> 12.All equipment used for the project including but not limited to tracked vehicles, <br /> barges, boats, hoses, sheet pile and pumps shall be de-contaminated for invasive i <br /> and exotic viruses and species prior to use and after use. <br /> I <br /> The following steps must be taken evea time you move your equipment to avoid <br /> transporting invasive and exotic viruses and species. To the extent practicable, <br /> equipment and gear used on infested waters shall not be used on other non-infested <br /> waters. <br /> I <br /> 1. Inspect and remove aquatic plants, animals, and mud from your equipment. <br /> 2. Drain all water from your equipment that comes in contact with infested waters, <br /> including but not limited to tracked vehicles, barges, boats, hoses, sheet pile and i <br /> pumps. <br /> i <br /> 3. Dispose of aquatic plants, animals in the trash, Never release or transfer aquatic <br /> I <br /> plants, animals or water from one waterbody to another. i <br /> i <br /> 4. Wash your equipment with hot (>140° F) and/or high pressure water, <br /> - OR - <br /> ' <br /> Allow your equipment to dry thoroughly for 5 days. <br /> 1 <br /> I <br />