Laserfiche WebLink
Surveyor checks these after GIS review <br />✓ Math check each lot and add all parts to be sure totals are correct. <br />wl-b-ogS, the pro:pose SM fit with the parcel map, if available? <br />i, Are all structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />res <br />a site and adjoiners shown? BC Ord. 58-52 (b) <br />the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />RPL Review — Surveyor / Zoning looks into any issues <br />✓Reconciles with Real Property Listing — Comments <br />Ill Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />Are additional parcels being created? <br />Are owner's certificates from all parties of interest included? <br />Has the CSM been approved by all approving authorities like a plat? <br />Is it monumented the same as a plat with bigger monuments at corners? <br />Has there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of 5 years? <br />236.02 (12) <br />Is the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />✓Parcel Identification Number(s): <br />V Lot Number with improvements — Comments <br />Treasurer Review (Let Sur`v�or1know about delinquency) <br />Treasurer Check for Taxes owed , T�.f(ti <br />SIGNATURE OF REVIEWER: DATE: J <br />\production\SURVEY\MISC ITEMS\Review Docs\CSM cheeksheet May_M18 <br />