Laserfiche WebLink
Surveyor checks these after GIS review <br />V Math check each lot and add all parts to be sure totals are correct. <br />t,-"5oes the proposed CSM fit with the parcel map, if available? <br />_LZ-Are a <br />_�Ij structures, bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br />o e site and adjoiners shown? BC Ord. 58-52 (b) <br />Does the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br />RPL Review — Surveyor / Zoning looks into any issues <br />\Aeconciles with Real Property Listing — Comments <br />Does this CSM cross the exterior boundary of a recorded plat? 236.34 (1) <br />tre additional parcels being created? <br />re owner's certificates from all parties of interest included? <br />Has the CSM been approved by all approving authorities like a plat? <br />Is it monumented the same as a plat with bigger monuments at corners? <br />Ir) Has there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of 5 years? <br />236.02 (12) <br />LIs the parcel in MFL? <br />Does CSM change or cross school or other taxing districts? <br />_11L/Parcel Identification Number(s): ?o4 i ' <br />\,-" Lot Number with improvements — Comments )<; <br />Treasurer Review — (Let <br />Treasurer Check for Taxes owed 4a0 <br />know about delinquency) <br />SIGNATURE OF REVIEWER: DATE: 23 % <br />\production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />