Laserfiche WebLink
Surveyor checks these after GIS review <br /> Z,,,, �ath check each lot and add all parts to be sure totals are correct. <br /> t/boes the proposed CSM fit with the parcel map, if available? <br /> all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on he site and adjoiners shown?BC Ord. 58-52 (b) <br /> oes the CSM cross a section line, 40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> A/'Reconciles with Real Property Listing—Comments <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> f Are owner's certificates from all parties of interest included? <br /> THas the CSM been approved by all approving authorities like a plat? <br /> Is 1t monumented the same as a plat with bigger monuments at corners? <br /> Has there been an adjacent CSM recorded with 4 parcels of 1 'h acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> Is the parcel in MFL? <br /> Does CSM change or cross school or other taxing districts? <br /> Parcel Identification Number(s): `' 'f <br /> "Lot Number with improvements—Comments <br /> Treasurer Review—(Let Surveff know about delinquency) <br /> V Treasurer Check for Taxes owed -711(r Z <br /> LS �ti�� 111 <br /> SIGNATURE OF REVIEWER: DATE: <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />