Laserfiche WebLink
Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> /Does the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Ooes the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> / RPL Review—Surveyor/Zoning looks into any issues <br /> V Reconciles with Real Property Listing—Comments <br /> i <br /> r_J Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> jIAre owner's certificates from all parties of interest included? <br /> Hasthe CSM been approved by all approving authorities like a plat? <br /> s it monumented the same as a plat with bigger monuments at corners? <br /> N Has there been an adjacent CSM recorded with 4 parcels of 1 'h acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> Is the parcel in MFL? <br /> �,111 Qoes CSM change or cross school or other taxing districts? <br /> ✓//Parcel Identification Number(s):_ 1122-7 p <br /> /1 of Number with improvements—Comments <br /> Treasurer Review— Let Surveyor kn w about delinquency) <br /> Treasurer Check for Taxes owede,$ (, ( wt �ZfXX <br /> 7 <br /> SIGNATURE OF REVIEWER: DATE: Z �" <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />