Laserfiche WebLink
�- Surveyor checks these after GIS review <br /> ✓Math check each lot and add all parts to be sure totals are correct. <br /> ✓hoes the proposed CSM fit with the parcel map, if available? <br /> 'Are all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Y Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues Z11-7) <br /> Reconciles with Real Property Listing—Comments <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> Has ere been an adjacent CSM recorded with 4 parcels of 1 % acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> Is the parcel in MFL? <br /> Does CSM change or cross school or other taxing districts? <br /> Parcel Identification Number(s): /9. 5 <br /> r <br /> ✓Lot Number with improvements—Comments 1-7 <br /> Treasurer Review—(Let Surveyor know a ut delinquency) <br /> Treasurer Check for Taxes ow T / <br /> _ <br /> SIGNATURE OF REVIEWER: DATE: -7 Zq / 1 <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />