Laserfiche WebLink
r <br /> Surveyor checks these after GIS review <br /> /Math check each lot and add all parts to be sure totals are correct. <br /> ,/I/boes the proposed CSM fit with the parcel map, if available? <br /> -,ZAre all structures,bodies of water, wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> ✓Reconciles with Real Property Listing-Comments <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> -t Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> Ll Has there been an adjacent CSM recorded with 4 parcels of 1 %2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> Is the parcel in MFL? <br /> Does CSM change or cross school or other taxing districts? <br /> ✓Parcel Identification Number(s): t � <br /> Lot Number with improvements-Comments _ rP Idea a/ <br /> Treasurer Review-(Let Surveyoyfnow about delinquency) <br /> Treasurer Check for Taxes owedGGaw <br /> �& L Y 4- 8117LM <br /> SIGNATURE OF REVIEWER: DATE: ?; 7 17- <br /> \production\SURVEYMISC ITEMS\Review Docs\CSM checksheet May_2018 <br />